• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 19 pages
Exam (elaborations)

NICET LEVEL 1 HIGHWAY CONSTRUCTION Questions and Answers (Best Rated)

Document preview thumbnail
Preview 3 out of 19 pages

Acceptance The written acceptance by the Department of the Work. acceptance testing Testing conducted by the Department to measure the degree of compliance to the Contract actual cost The computed cost using calculations provided addendum A Contract revision or response to a Contractor inquiry issued after advertisement and before the opening of bids. as-built quantity The quantity of a completed Item eligible for payment Master01 | September, 2024/2025 | Latest update 1 | P a g e | © copyright 2024/2025 | Grade A+ authorized funding amount The amount of funds authorized by the Department for the Contract Bidder The individual, firm, partnership, corporation, joint venture, or any acceptable combination thereof that submits a bid to the Department. bridge . A structure, other than a culvert, including supports, erected over a depression or an obstruction, such as water, highway, or railway, and having a track or passageway for carrying traffic or other moving loads and having a length 3 measured along the center of the structure of more than 20 feet between undercopings of abutments or extreme ends of openings for multiple boxes. Structure dimensions are defined as follows: bridge length Master01 | September, 2024/2025 | Latest update 1 | P a g e | © copyright 2024/2025 | Grade A+

Content preview

1 | P a g e | © copyright 2024/2025 | Grade A+




NICET LEVEL 1 HIGHWAY
CONSTRUCTION Questions and
Answers (Best Rated)
Acceptance


✓ The written acceptance by the Department of the Work.




acceptance testing


✓ Testing conducted by the Department to measure the degree of

compliance to the Contract




actual cost


✓ The computed cost using calculations provided




addendum


✓ A Contract revision or response to a Contractor inquiry issued after

advertisement and before the opening of bids.




as-built quantity


✓ The quantity of a completed Item eligible for payment




Master01 | September, 2024/2025 | Latest update

, 1 | P a g e | © copyright 2024/2025 | Grade A+

authorized funding amount


✓ The amount of funds authorized by the Department for the Contract




Bidder


✓ The individual, firm, partnership, corporation, joint venture, or any

acceptable combination thereof that submits a bid to the

Department.




bridge


✓ . A structure, other than a culvert, including supports, erected over a

depression or an obstruction, such as water, highway, or railway, and

having a track or passageway for carrying traffic or other moving loads

and having a length 3 measured along the center of the structure of

more than 20 feet between undercopings of abutments or extreme

ends of openings for multiple boxes. Structure dimensions are defined

as follows:




bridge length




Master01 | September, 2024/2025 | Latest update

, 1 | P a g e | © copyright 2024/2025 | Grade A+

✓ The overall length measured along the line of survey stationing from

back to back of backwalls of abutments, if present, otherwise end to

end of the bridge floor; but, in no case less than the total clear opening

of the structure




bridge width


✓ The clear width measured at right angles to the longitudinal centerline

of the bridge between the bottom of curbs, or in the case of multiple

height of curbs, between the bottoms of the lower risers or, if curbs are

not used, between inner faces of parapet or railing




Change Order.


✓ A written order issued by the Department to the Contractor after

execution of the Contract authorizing one or more of the following: 1.

Changes in the Work. 2. Modifications in the basis of payment. 3.

Modifications to Contract Time.




Commercially Useful Function




Master01 | September, 2024/2025 | Latest update

Document information

Uploaded on
October 20, 2024
Number of pages
19
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Axpert
3.8
(127)
Sold
577
Followers
168
Items
29738
Last sold
21 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions