cmp 101 final EXAM PREP WITH
COMPLETE SOLUTION
-=


Chaos
or
A Well Orchestrated Effort? - =-Delivery trucks
-Fork lifts
-Workers running around
-Banging
-Dirt & dust flying


Superintendent
(The Conductor) - =A construction superintendent is the owner's or contractor's representative
on site. They are responsible for:
-coordination of workers and vendors
-continuous field supervision, and
-completion of the work.


The construction superintendent
"runs" the job site.


Superintendent's Tasks
(Generic) - =Some job related tasks:
-Is responsible for controlling costs.
-Organizes and coordinates subcontractors.
-Has control over the schedule - start / finish dates.
-Keeps cost records on work performed and materials used.

,-Assures conformity with the plans and specifications through regular inspections.
-Supervises the clerical staff, and other personnel employed on the site and handles safety
training.
-Must have a great deal of construction experience.


Superintendent's
Ultimate Goals - =Keep the project:
-on schedule,
-within budget,
-with the highest quality, and
-insure that each worker goes home at the end of each day the same way they arrived at work
in the morning (safety)


Construction Operations - =The actual work it takes to build a
project:
-Laying out the foundation
-Placing concrete
-Laying blocks and bricks
-Setting steel
-Framing walls
-Installing the building's systems, etc.


Superintendent's Tasks Summarized: - =-Subcontractor coordination
-Productivity
-Material and equipment deliveries
-Coordination with outside agencies
-Quality control
-Job site safety

,Subcontractor Coordination - =-Subcontractors are not a jack-of-all-trades, master-of-none.
-Many subcontractors are licensed for the work they are qualified to do.
-Most building construction on-site work is performed by subcontractors who are experts in
their area of experience.
-They are independent business men and women.
-They often have several projects where they must send their employees on any given day


Subcontractor Coordination Made Easy - =-Resist bringing them to a site before you are
completely ready for them.
-Coordinate multiple subcontractors so they are not in each other's way.
-Be firm but respectful in your requests.
-Pay them promptly.


Weekly Sub. Meetings - =-Review work in progress
-Update changes to the plans and/or specs.
-Update changes in the schedule
-Discuss potential conflicts
-Clarify procedural questions
-Discuss what is going right, and what is going wrong


Installation of Heat Cambered Beams - =-A heat cambered beam should be erected with the
heat marks on the bottom side of the beam (see top diagram above)
-This places the beam in a camber up (or concave down) orientation
-Heat marks can be seen on the beams in the bottom picture above


Productivity - == output ÷ input.
600 CMU's placed per crew of 2, per day

, 12 doors hung per crew of 1, per day


*CM should optimize the conditions that contribute positively to productivity.


Productivity Killers - =-Inadequate plans and specs (Designer)
-Frequent changes to plans and specs (Designer and/or Owner).
-Bad weather (acts of Mother Nature)
-Poor, or no supervision
-Inefficient site layout
-Crowded work space
-Poor coordination
-Improper tools and equipment
-Inexperienced or poorly trained workforce.


Coordination With
Local Agents - =-*Building department - permits & inspections
-*Zoning department - laws and regulations governing use
-*Fire marshal - head of a fire dept. and/or the head of fire prevention and investigations
-Testing agencies, if applicable
-Utilities - electric, telephone, water, sewer, and natural gas.


*Any one can bring your job to a stop.
"You can't fight city hall".


Safety Items To Consider - =-First aid kit on site
-Regular safety meetings
-Regular trash removal

Written for

Institution
Cmp 101
Course
Cmp 101

Document information

Uploaded on
September 1, 2024
Number of pages
51
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$14.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
hurryben
3.0
(1)

Get to know the seller

Seller avatar
hurryben Harvard University
View profile
Follow You need to be logged in order to follow users or courses
Sold
12
Member since
2 year
Number of followers
5
Documents
1808
Last sold
11 months ago

3.0

1 reviews

5
0
4
0
3
1
2
0
1
0

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions