PJM GENERATOR EXAM (ACTUAL)
If PJM ACE shows overgeneration, actual imports are - ANSWERS-less than
scheduled.
Which of the following reports will PJM request when a Maximum Generations
Emergency Alert is issued? - ANSWERS-Supplementary Status Report
If a fossil steam unit has less than 32 hours of fuel at maximum capacity, it should
be bid at - ANSWERS-maximum emergency.
PJM responds to capacity shortages by issuing alerts - ANSWERS-in advance of a
scheduled load period to allow sufficient time for members to prepare for
anticipated initial capacity shortages.
During black start restoration, priority access to cranking power should be given
to - ANSWERS-hot units that can return to service immediately
Which of the following factors does NOT influence the load forecast? - ANSWERS-
planned generation outages
Severe cold weather conditions require which of the following to be staffed,
started, and available for loading? - ANSWERS-Combustion turbines and diesels
, During system restoration, a generator should not be loaded above the level of
available - ANSWERS-dynamic reserve
The minimum passing score for a unit regulation test is - ANSWERS-75%
compliance with test signal
PJM limits interchange to a - ANSWERS-change in total net interchange of 1000
MW every 15 minutes
Which of the following PJM systems are used to report unit outages? - ANSWERS-
eDART, eMKT, and eGADS
The purpose of the Deploy All Resources Action is to instruct all generating
resources to be on line and at full output _________ - ANSWERS-immediately
upon receipt of dispatch instruction
A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO.
Generation Operators should: - ANSWERS-Ensure all unit voltage regulators are in
service
PJM can issue the Deploy All Resources Action for________ - ANSWERS-the entire
RTO, specific Control Zones or a subset of a Control Zone if transmission
limitations exist
If PJM ACE shows overgeneration, actual imports are - ANSWERS-less than
scheduled.
Which of the following reports will PJM request when a Maximum Generations
Emergency Alert is issued? - ANSWERS-Supplementary Status Report
If a fossil steam unit has less than 32 hours of fuel at maximum capacity, it should
be bid at - ANSWERS-maximum emergency.
PJM responds to capacity shortages by issuing alerts - ANSWERS-in advance of a
scheduled load period to allow sufficient time for members to prepare for
anticipated initial capacity shortages.
During black start restoration, priority access to cranking power should be given
to - ANSWERS-hot units that can return to service immediately
Which of the following factors does NOT influence the load forecast? - ANSWERS-
planned generation outages
Severe cold weather conditions require which of the following to be staffed,
started, and available for loading? - ANSWERS-Combustion turbines and diesels
, During system restoration, a generator should not be loaded above the level of
available - ANSWERS-dynamic reserve
The minimum passing score for a unit regulation test is - ANSWERS-75%
compliance with test signal
PJM limits interchange to a - ANSWERS-change in total net interchange of 1000
MW every 15 minutes
Which of the following PJM systems are used to report unit outages? - ANSWERS-
eDART, eMKT, and eGADS
The purpose of the Deploy All Resources Action is to instruct all generating
resources to be on line and at full output _________ - ANSWERS-immediately
upon receipt of dispatch instruction
A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO.
Generation Operators should: - ANSWERS-Ensure all unit voltage regulators are in
service
PJM can issue the Deploy All Resources Action for________ - ANSWERS-the entire
RTO, specific Control Zones or a subset of a Control Zone if transmission
limitations exist