CMIT EXAM
Terms in this set (200)
A 5D BIM model D) Cost
incorporates which project
attribute?
A) Schedule
B) Quality
C) Phasing
D) Cost
21. True
In a CM-at-Risk
arrangement once
construction begins and the
CM converts from the
professional advisory role
of a CM to the contractual
role of a general contractor,
the CM has no implied
duties of loyalty and care to
the owner.
True False
According to the CMAA True
agency series contract
documents, the CM and
designer are required to
cooperate for the benefit of
the owner.
True False
,Actual usage of a particular D) All of the above
contract form for the
construction phase
depends on:
A) The particular delivery
system being used.
B) The type of project being
implemented and the
completion status of the
plans and specifications at
the time of contracting.
C) The consideration of any
performance requirements,
the level of sophistication
of the owner, and the role
of the architect/engineers
involved.
D) All of the above
A/E services are required to False
be competitively bid under
the "Brooks Act."
True False
After a contractor declares B) Punchlist
that he is substantially
complete on a project, the
owner and/or CM should
prepare what document?
A) Bond release
B) Punchlist
C) Commissioning plan
D) Final payment
, After the owner accepts a False
CM's proposed GMP as
contemplated by the CMAA
CM-at-Risk Series
documents, the
responsibilities and duties
of the CM are essentially
the same as if the owner
and CM were using the AIA
GMP documents.
True False
The agency CM does not True
perform design or actual
construction work.
True False
Agency CM is a distinct set True
of services that can be
applied to any project
delivery method.
True False
The agency CM maintains a False
direct contractual
relationship with the trade
or prime contractors.
True False
An agency CM with a fixed False
fee compensation
arrangement shares in the
savings generated by a
lower than planned
construction cost of the
project.
Terms in this set (200)
A 5D BIM model D) Cost
incorporates which project
attribute?
A) Schedule
B) Quality
C) Phasing
D) Cost
21. True
In a CM-at-Risk
arrangement once
construction begins and the
CM converts from the
professional advisory role
of a CM to the contractual
role of a general contractor,
the CM has no implied
duties of loyalty and care to
the owner.
True False
According to the CMAA True
agency series contract
documents, the CM and
designer are required to
cooperate for the benefit of
the owner.
True False
,Actual usage of a particular D) All of the above
contract form for the
construction phase
depends on:
A) The particular delivery
system being used.
B) The type of project being
implemented and the
completion status of the
plans and specifications at
the time of contracting.
C) The consideration of any
performance requirements,
the level of sophistication
of the owner, and the role
of the architect/engineers
involved.
D) All of the above
A/E services are required to False
be competitively bid under
the "Brooks Act."
True False
After a contractor declares B) Punchlist
that he is substantially
complete on a project, the
owner and/or CM should
prepare what document?
A) Bond release
B) Punchlist
C) Commissioning plan
D) Final payment
, After the owner accepts a False
CM's proposed GMP as
contemplated by the CMAA
CM-at-Risk Series
documents, the
responsibilities and duties
of the CM are essentially
the same as if the owner
and CM were using the AIA
GMP documents.
True False
The agency CM does not True
perform design or actual
construction work.
True False
Agency CM is a distinct set True
of services that can be
applied to any project
delivery method.
True False
The agency CM maintains a False
direct contractual
relationship with the trade
or prime contractors.
True False
An agency CM with a fixed False
fee compensation
arrangement shares in the
savings generated by a
lower than planned
construction cost of the
project.