100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

COSC 353 final Exam Questions and Answers

Rating
-
Sold
1
Pages
11
Grade
A+
Uploaded on
18-06-2024
Written in
2023/2024

COSC 353 final Exam Questions and Answers A professional registered by the state - Correct Answer️️ -Designer Looked to for smooth orchestration of the project - Correct Answer️️ -Construction Manager Responsible for financing and land acquisition - Correct Answer️️ -Owner Responsible for the physical construction work of the project - Correct Answer️️ - Construction Trades The construction industry employs (according to BLS) - Correct Answer️️ -7,300,000 Commercial (building is the largest segment of the construction industry - Correct Answer️️ -False Most construction is financed through private ownership - Correct Answer️️ -True Private - sector Projects are funded by tax dollars through cities, towns, states, and the goverment - Correct Answer️️ -False A project is a temporary endeavor undertaken to create a unique product, service, or result - Correct Answer️️ -True Which of the following categories of projects is often publicly funded and called infrastructure? - Correct Answer️️ -Heavy Engineering Drawings and specification are the output of what stage of a project? - Correct Answer️️ -Engineering and design Ranked form largest to smallest, the segments are: - Correct Answer️️ -Heavy Engineering, Residential, Commercial, IndustrialSMART PDF Which category of construction is characterized by many small companies great instability during economic recessions? - Correct Answer️️ -Residential In the case of design/build, the constructor acts as a general contractor with single-firm control of all subcontractors. - Correct Answer️️ -True One advantage of Design/Bid/Build method is know project costs before construciton begins - Correct Answer️️ -True Private projects may use invitation for bids to specific contractors that have done past work - Correct Answer️️ -True A seven point code of "expected ethical behavior" is published by - Correct Answer️️ - AIC The 3 steps a project manager does to schedule an operation are as follows: Identify activity, change mission, and develop logic - Correct Answer️️ -False When estimates and schedules are initially prepared, unlimited resource

Show more Read less
Institution
COSC 353
Course
COSC 353









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
COSC 353
Course
COSC 353

Document information

Uploaded on
June 18, 2024
Number of pages
11
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
OliviaWest Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
109
Member since
1 year
Number of followers
17
Documents
8528
Last sold
2 weeks ago
Pure Orchid Haven.

All Documents,and package deals offered by seller Olivia West.

2.8

22 reviews

5
6
4
2
3
4
2
1
1
9

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions