100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Voice-Data-Video System Drawings and Specifications Questions & Answers 100% Correct!!

Rating
-
Sold
-
Pages
31
Grade
A+
Uploaded on
20-05-2024
Written in
2023/2024

Chapter 1: Project Professionals, Design Phases, and the Construction Process A typical commercial construction project begins with a( n ) __________ seeking to develop a new or existing property to meets specific needs. A. Architect B. Engineer C. General Contractor ( GC ) D. Owner - ANSWER-Owner Chapter 1: Project Professionals, Design Phases, and the Construction Process The __________ is responsible for all inspections, the final building occupancy approval sign-off, and the commissioning of all building systems. A. Architect B. Engineer C. General Contractor ( GC ) D. Owner - ANSWER-General Contractor ( GC ) Chapter 1: Project Professionals, Design Phases, and the Construction Process The __________ phase gives the owner the first opportunity to see the potential design and get an approximation of the costs A. Bidding B. Construction document C. Design development D. Schematic design - ANSWER-Schematic design Chapter 1: Project Professionals, Design Phases, and the Construction Process The __________ are the fully completed design that complies with building codes and industry standards and are ready for bidding and, ultimately, the construction of the facility A. Addendum B. Construction documents C. Drawings D. Specifications - ANSWER-Construction documents Chapter 1: Project Professionals, Design Phases, and the Construction Process The bidding method is often used for the electrical and VDV system portions of a project. A. Competing B. Cost-plus C. Labor-only D. Negotiated/design-assist - ANSWER-Labor-only Chapter 1: Project Professionals, Design Phases, and the Construction Process The __________ bidding method can often save time, provide flexibility, and avoid the risk of removing completed or partially completed work and starting over. A. Competitive B. Cost-plus C. Labor-only D. Negotiated/design-assist - ANSWER-Cost-plus Chapter 1: Project Professionals, Design Phases, and the Construction Process Most often, the product selection for private work is specified by __________. A. Cost B. Industry standards C. Specific OEMs D. Performance - ANSWER-Specific OEMS Chapter 1: Project Professionals, Design Phases, and the Construction Process A( n ) __________ is a document that project managers use to resolve conflicts early in the process to attempt to eliminate costly corrective measures A) Addendum B) Construction change directive

Show more Read less
Institution
Voice-Data-Video System Drawings And Specification
Course
Voice-Data-Video System Drawings and Specification











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Voice-Data-Video System Drawings and Specification
Course
Voice-Data-Video System Drawings and Specification

Document information

Uploaded on
May 20, 2024
Number of pages
31
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
papersbyjol West Virginia
View profile
Follow You need to be logged in order to follow users or courses
Sold
421
Member since
2 year
Number of followers
253
Documents
13980
Last sold
1 week ago

3.8

72 reviews

5
27
4
18
3
17
2
2
1
8

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions