100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

ACI Grade 1 - Written Test 2024 with Complete Solutions

Rating
-
Sold
-
Pages
31
Grade
A+
Uploaded on
19-02-2024
Written in
2023/2024

ACI Grade 1 - Written Test 2024 with Complete Solutions Sampling by this practice covers procedures for obtaining representative samples, on which tests are to be performed to determine ___ with quality requirements of the specifications listed under which the concrete is furnished (C172/C172M-17 = Sampling Freshly Mixed Concrete) -Answer-Compliance This practice covers sampling from five types of equipment which are... (C172/C172M- 17 = Sampling Freshly Mixed Concrete) -Answer-Stationary, paving, revolving drum, continous, and open top mixers The elapsed time between obtaining the first and final portions of a composite sample shall not exceed... (C172/C172M-17 = Sampling Freshly Mixed Concrete) -Answer-15 mins T or F: Portions of a composite sample shall be thoroughly remixed before beginning tests on the sample (C172/C172M-17 = Sampling Freshly Mixed Concrete) -Answer- True Start tests for slump, temperature, and air content within ___ after obtaining the final portion of the composite sample (C172/C172M-17 = Sampling Freshly Mixed Concrete) -Answer-5 Start molding specific ends for strength tests within ___ after fabricating the composite sample (C172/C172M-17 = Sampling Freshly Mixed Concrete) -Answer-15 The concrete sample must be protected from contamination and ... (C172/C172M-17 = Sampling Freshly Mixed Concrete) -Answer-Rapid evaporation (also sun and wind) The minimum size sample for making strength test specimens is ... (C172/C172M-17 = Sampling Freshly Mixed Concrete) -Answer-28 L (aka 1 ft3) When sampling from a stationary mixer, the batch must be sampled at ___ or more regularly spaced intervals during discharge of the middle portion of the batch (C172/C172M-17 = Sampling Freshly Mixed Concrete) -Answer-2 When sampling from a paving mixer, obtain samples from at least ___ different portions of the pile and combine them into one composite sample for test purposes (C172/C172M-17 = Sampling Freshly Mixed Concrete) -Answer-5 When sampling from a revolving drum truck mixer, sample the concrete by collecting ___ or more portions take at regularly spaced intervals during discharge of the middle portion of the batch. (C172/C172M-17 = Sampling Freshly Mixed Concrete) -Answer-2 T or F: Concrete samples from a truck mixer must be obtained before any water or admixtures are added to the mixer at the job site. (C172/C172M-17 = Sampling Freshly Mixed Concrete) -Answer-F The composite sample from a truck mixer must be obtained from the ___ portion of the batch (C172/C172M-17 = Sampling Freshly Mixed Concrete) -Answer-Middle When the concrete contains aggregate larger than that permitted for a particular test method, the sample of concrete must be _____ before making the test. (C172/C172M- 17 = Sampling Freshly Mixed Concrete) -Answer-Wet Sieved The end of the temperature sensing portion of the temperature measuring device is Submerged a minimum of ____ into the freshly mixed concrete (C1064/C1064M-17, Temperature of Freshly Mixed Hydraulic-cement concrete) -Answer-75 mm (3 in) The temperature measuring device shall be capable of accurately measuring the temperature of freshly mixed concrete to ____ throughout a range of ____. (C1064/C1064M-17, Temperature of Freshly Mixed Hydraulic-cement concrete) - Answer-+/- 0.5 C, 0 to 50 C (30 to 120 F) The temperature measuring device shall be verified ___, or whenever there is a question of ___. (C1064/C1064M-17, Temperature of Freshly Mixed Hydraulic-cement concrete) -Answer-Annually, accuracy T or F: The temperature of concrete may be measured in a wheelbarrow (C1064/C1064M-17, Temperature of Freshly Mixed Hydraulic-cement concrete) - Answer-True T or F: The temperature of concrete may be measured in a wall form. (C1064/C1064M- 17, Temperature of Freshly Mixed Hydraulic-cement concrete) -Answer-True T or F: A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. (C1064/C1064M-17, Temperature of Freshly Mixed Hydraulic-cement concrete) -Answer-False What must be done to the sample containers prior to sampling the concrete? (C1064/C1064M-17, Temperature of Freshly Mixed Hydraulic-cement concrete) - Answer-Dampened (with water) What must be done to the concrete surrounding the temperature measuring after the device is submerged in the fresh concrete? (C1064/C1064M-17, Temperature of Freshly Mixed Hydraulic-cement concrete) -Answer-Gently press the concrete around the temperature measuring device at the surface of the concrete (to remove air voids) How long must the measuring device remain in the freshly mixed concrete? (C1064/C1064M-17, Temperature of Freshly Mixed Hydraulic-cement concrete) - Answer-At least 2 mins, but not more than 5 minutes After the temperature of the concrete is read, what is then required? (C1064/C1064M- 17, Temperature of Freshly Mixed Hydraulic-cement concrete) -Answer-Reporting of temperature The temperature of the concrete is reported to the nearest... (C1064/C1064M-17, Temperature of Freshly Mixed Hydraulic-cement concrete) -Answer-0.5 C (1 F) According to Test Method C1064/C1064M, what is one reason to take the temperature of concrete? (C1064/C1064M-17, Temperature of Freshly Mixed Hydraulic-cement concrete) -Answer-Verify conformance to a specified requirement for temperature of concretely T or F: A maximum temperature of freshly mixed concrete is specified in ASTM C1064. (C1064/C1064M-17, Temperature of Freshly Mixed Hydraulic-cement concrete) - Answer-False T or F: The sample of concrete used for temperature determination must be rodded 25 times. (C1064/C1064M-17, Temperature of Freshly Mixed Hydraulic-cement concrete) - Answer-False (not rodded at all) The slump test is applicable to plastic concrete with a maximum size aggregate of _____. (C143/C143M - 15a, Slump of Hydraulic-Cement Concrete) -Answer-1.5 in (37.5 mm)

Show more Read less
Institution
ACI
Module
ACI











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ACI
Module
ACI

Document information

Uploaded on
February 19, 2024
Number of pages
31
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
KatelynWhitman West Virginia University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1130
Member since
2 year
Number of followers
483
Documents
35591
Last sold
2 days ago
Golden Quill Emporium Store

Get Yourself Well-Researched Study Materials to Ace Your Online& Actual Exam Tests with Confidence. STUDY LIKE A PRO WITH A WELL FORMATTED Q&A MATERIALS.

3.6

245 reviews

5
100
4
39
3
54
2
20
1
32

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions