• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 12 pages
Exam (elaborations)

Csi Cdt Exam With 100% Correct Answer.

Document preview thumbnail
Preview 2 out of 12 pages

CSI CDT EXAM WITH 100% CORRECT ANSWER. Stages of Facility Life Cycle - CORRECT ANSWER-1. Project Conception 2. Design 3. Construction Documents, 4. Procurement 5. Construction 6. Facility Management Quality Assuance - CORRECT ANSWER-Procedures for guarding against defects and during execution of work (by A/E) *PRECONSTRUCTION* Quality Control - CORRECT ANSWER-Procedures for evaluating completed activities and elements of the design for conformance with requirements (by Contractor) Stages of Design - CORRECT ANSWER-1. Conceptual Design 2. Schematic Design 3. Design Development Conceptual Design (of design stage) - CORRECT ANSWER--conveys aesthetics -rough representation of site -gives shape, form, and meaning Schematic Design (of design stage) - CORRECT ANSWER--develop site plan and area relationships -rough elevations -develop preliminary product description Design Development (of design stage) - CORRECT ANSWER--define materials, surfaces, and details -produce sections and elevations -outline specs!!! OmniClass Specs - CORRECT ANSWER--series of tables -two-digit numbering UniFormat Specs - CORRECT ANSWER--developed by CSI -uses letters and numbers -usually beginning of design, followed by MasterFormat MasterFormat Specs - CORRECT ANSWER--developed by CSI -master list of numbers and titles -2 groups and 5 subgroups -50 divisions total (DIV 00 - DIV 49) Four Cs of Communication - CORRECT ANSWER-Clear Concise Correct Complete Drawings vs. Specs - CORRECT ANSWER-Drawings represent quantitative information Specs represent qualitative information GreenFormat Specs - CORRECT ANSWER--developed by CSI -web-based tool to accurately report product sustainability properties NIST's BEES - CORRECT ANSWER-BEES = Building for Environmental and Economic Sustainability Measures: -global warming potential -natural resource depletion Regulatory requirements - CORRECT ANSWER--building code requirements -land development requirements -accessibility -federal emergency management administration Design-Bid-Build (D-B-B) - CORRECT ANSWER--competitive bid -competitive proposal -negotiated Construction Manager at Risk (CMaR) - CORRECT ANSWER--bring in someone knowledgeable on construction topics at an early stage, while construction documents are being developed. -the construction professional cannot bid on the project now Design-Bid (D-B) - CORRECT ANSWER--designer-builder provides all services -use the Owner's A/E -one prime contract -typically the contractor is the lead and the A/

Content preview

CSI CDT EXAM WITH 100% CORRECT ANSWER. Stages of Facility Life Cycle - CORRECT ANSWER -1. Pr oject Conception 2. Design 3. Construction Documents, 4. Procurement 5. Construction 6. Facility Management Quality Assuance - CORRECT ANSWER -Procedures for guarding against defects and during execution of work (by A/E) *PRECONSTRUCTION* Quality Control - CORRECT ANSWER -Procedures for evaluating completed activities and elements of the design for conformance with requirements (by Contractor) Stages of Design - CORRECT ANSWER -1. Conceptual Design 2. Schematic Design 3. Design Development Conceptual Desig n (of design stage) - CORRECT ANSWER --conveys aesthetics -rough representation of site -gives shape, form, and meaning Schematic Design (of design stage) - CORRECT ANSWER --develop site plan and area relationships -rough elevations -develop preliminary product description Design Development (of design stage) - CORRECT ANSWER --define materials, surfaces, and details -produce sections and elevations -outline specs!!! OmniClass Specs - CORRECT ANSWER --series of tables -two-digit numbe ring UniFormat Specs - CORRECT ANSWER --developed by CSI -uses letters and numbers -usually beginning of design, followed by MasterFormat MasterFormat Specs - CORRECT ANSWER --developed by CSI -master list of numbers and titles -2 groups and 5 subgroups -50 divisions total (DIV 00 - DIV 49) Four Cs of Communication - CORRECT ANSWER -Clear Concise Correct Complete Drawings vs. Specs - CORRECT ANSWER -Drawings represent quantitative information Specs represent qualitative information GreenFormat Specs - CORR ECT ANSWER --developed by CSI -web-based tool to accurately report product sustainability properties NIST's BEES - CORRECT ANSWER -BEES = Building for Environmental and Economic Sustainability Measures: -global warming potential -natural resource depletion Regulatory requirements - CORRECT ANSWER --building code requirements -land development requirements -accessibility -federal emergency management administration Design -Bid-Build (D -B-B) - CORRECT ANSWER --competitive bid -competitive proposal -negotiated Construction Manager at Risk (CMaR) - CORRECT ANSWER --bring in someone knowledgeable on construction topics at an early stage, while construction documents are being developed. -the construction professional cannot bid on the project now Design -Bid (D -B) - CORRECT ANSWER --designer -builder provides all services -use the Owner's A/E -one prime contract -typically the contractor is the lead and the A/E is the sub Owner -Build (O -B) - CORRECT ANSWER --one contract with the A/E -Owner is controlling the entire project -don't need full set of contract documents for this type of build Integrated Project Delivery (IPD) - CORRECT ANSWER -All participants collaborate closely from the projects earliest conceptualization to move in. Owner has multiple agreements with independent design and construction firms

Document information

Uploaded on
September 29, 2023
Number of pages
12
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$16.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
lectheavens
4.0
(5)
Sold
50
Followers
12
Items
420
Last sold
5 months ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions