CSI CDT EXAM WITH 100% CORRECT ANSWER.
CSI CDT EXAM WITH 100% CORRECT ANSWER. Stages of Facility Life Cycle - CORRECT ANSWER-1. Project Conception 2. Design 3. Construction Documents, 4. Procurement 5. Construction 6. Facility Management Quality Assuance - CORRECT ANSWER-Procedures for guarding against defects and during execution of work (by A/E) *PRECONSTRUCTION* Quality Control - CORRECT ANSWER-Procedures for evaluating completed activities and elements of the design for conformance with requirements (by Contractor) Stages of Design - CORRECT ANSWER-1. Conceptual Design 2. Schematic Design 3. Design Development Conceptual Design (of design stage) - CORRECT ANSWER--conveys aesthetics -rough representation of site -gives shape, form, and meaning Schematic Design (of design stage) - CORRECT ANSWER--develop site plan and area relationships -rough elevations -develop preliminary product description Design Development (of design stage) - CORRECT ANSWER--define materials, surfaces, and details -produce sections and elevations -outline specs!!! OmniClass Specs - CORRECT ANSWER--series of tables -two-digit numbering UniFormat Specs - CORRECT ANSWER--developed by CSI -uses letters and numbers -usually beginning of design, followed by MasterFormat MasterFormat Specs - CORRECT ANSWER--developed by CSI -master list of numbers and titles -2 groups and 5 subgroups -50 divisions total (DIV 00 - DIV 49) Four Cs of Communication - CORRECT ANSWER-Clear Concise Correct Complete Drawings vs. Specs - CORRECT ANSWER-Drawings represent quantitative information Specs represent qualitative information GreenFormat Specs - CORRECT ANSWER--developed by CSI -web-based tool to accurately report product sustainability properties NIST's BEES - CORRECT ANSWER-BEES = Building for Environmental and Economic Sustainability Measures: -global warming potential -natural resource depletion Regulatory requirements - CORRECT ANSWER--building code requirements -land development requirements -accessibility -federal emergency management administration Design-Bid-Build (D-B-B) - CORRECT ANSWER--competitive bid -competitive proposal -negotiated Construction Manager at Risk (CMaR) - CORRECT ANSWER--bring in someone knowledgeable on construction topics at an early stage, while construction documents are being developed. -the construction professional cannot bid on the project now Design-Bid (D-B) - CORRECT ANSWER--designer-builder provides all services -use the Owner's A/E -one prime contract -typically the contractor is the lead and the A/
Written for
- Institution
- CSI CDT
- Course
- CSI CDT
Document information
- Uploaded on
- September 29, 2023
- Number of pages
- 12
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- quality assuance
- stages of design
- masterformat specs
- four cs of communication
- csi cdt exam w
-
stages of facility life cycle
-
schematic design of design stage
-
design development of design stage
Content preview
Also available in package deal