What is one characteristic of an effective Agile Team? ✔✔To provide steady, high quality,
incremental value
How does a Scrum Master lead a team's efforts in relentless improvement? ✔✔By facilitating the
Iteration Retrospective
How does the Scrum Master help teams address the challenges of modern Enterprises? ✔✔By
actively addressing impediments
Why are SAFe Scrum Masters challenged differently in an Enterprise? ✔✔The team is affected
by teams and stakeholders beyond their control
Which SAFe configuration requires having a Vision? ✔✔All SAFe configurations
Which SAFe organizational construct allows businesses to build large and complex systems which
require hundreds of people in a Lean-Agile manner? ✔✔Solution Train
Who is responsible for assisting to establish Continuous Integration in SAFe? ✔✔The System
Team
SAFe Scrum Masters interact with which level(s) of Framework? ✔✔All Levels
One of the Scrum Master's main responsibilities is to communicate with management and outside
stakeholders to help the team in what way? ✔✔Protect them from uncontrolled addition of work
, What provides objective evidence that the system is iterating? ✔✔System Demo
In complex systems development, what do local integration points ensure? ✔✔That each
Capability of the system is meeting its responsibilities in contributing to the overall Solution Intent
Which statement is true about the phase-gate Milestone model? ✔✔It does not mitigate risk as
intended
How can learning Milestones be used? ✔✔To test the concept of a new Feature or Capability
What are two reasons why too much work in process (WIP) is a problem? (Choose two.) ✔✔It
hides bottlenecks in the workflow;It shows that the overall system is inefficient;
What is the connection between feedback and optimum batch size? ✔✔Lack of feedback
contributes to higher holding cost
What is the value of periodic resynchronization? ✔✔It limits variance to a single time interval
How should decentralized decision-making be used with respect to system design? ✔✔When
Agile Teams are empowered, self-organized, and the design is allowed to emerge
During Iteration planning, the Product Owner (PO) introduces a new Story to the team. They
cannot come to a consensus on the size of the new Story and ask the PO for more details. ✔✔No;
the team left the Story in the Team Backlog for further refinement with the PO
A team's Product Owner (PO) takes an unexpected leave of absence for the last week of the
Iteration. Three of the team's Stories have been completed and are waiting to be accepted.
✔✔Work with the Release Train Engineer to find a solution