DBIA Certification Exam Study Guide (New Update 2026/2027) Questions with 100% Correct Answers| Graded A+

Document preview thumbnail
Preview 4 out of 37 pages

DBIA Certification Exam Study Guide (New Update 2026/2027) Questions with 100% Correct Answers| Graded A+ DBIA Certification Exam Study Guide (New Update 2026/2027) Questions with 100% Correct Answers| Graded A+

Content preview

DBIA Certification Exam Study Guide
(New Update 2026/2027) Questions
with 100% Correct Answers| Graded A+
Question:

Design-Build?
Answer:
The owner contracts with one entity (a person or firm) to provide both
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


design and construction services, designer and contractor have a direct
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-



contractual relationship, selected by QBS or best value, wide spectrum of
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


contracting approaches and organizational structures, single point
i,- i,- i,- i,- i,- i,- i,-


responsibility, owner does not manage designer, owner exposure to
i,- i,- i,- i,- i,- i,- i,- i,- i,-


claims is significantly reduced
i,- i,- i,-




Question:
Engineer procure construct (epc)?
i,- i,- i,-




Answer:
similar to design build, in industrial and power generation sectors,
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


systems and performance testing are central to scope, contractor will
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


typically perform engineering with its in-house staff, owner has need for
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


single point responsibility, contracts include plant and process
i,- i,- i,- i,- i,- i,- i,- i,-



performance guarantees, contract items include performance and
i,- i,- i,- i,- i,- i,- i,-


schedule liquidated damages and limitations of liability
i,- i,- i,- i,- i,- i,-

,Question:

Multiple Prime Contracting? i,- i,-




Answer:

owner contracts with multiple trade contractors, attributes are typically
i,- i,- i,- i,- i,- i,- i,- i,- i,-


similar to dbb, owner's ability to schedule and coordinate the work
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-




Question:

Integrated Project Delivery (IPD)? i,- i,- i,-




Answer:
multi-party agreement - all parties equal, QBS procurement and target
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


pricing contract approach, private sector use (limited at this time), key:
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-



owner's ability to accept risk
i,- i,- i,- i,-




Question:
public-private partnership (p3)? i,- i,-




Answer:

Instead of government building and maintaining major infrastructure
i,- i,- i,- i,- i,- i,- i,- i,-


(such as highway, water treatment plant), build and maintenance is
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


outsourced to a private company. Opposed by public sector unions. this is
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-



not considered a delivery system but its underlying approaches are
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


delivery systems and typically use DB. multiple procurement and
i,- i,- i,- i,- i,- i,- i,- i,- i,-


contracting approaches i,-

,Question:

shift left?
i,-




Answer:

intense efforts to establish scope early in the process; drives early team
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


formation to include key trade subcontractors; can enable big decisions to
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-



be made early, affect project outcomes at lowest cost, establish a need for
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


co-location and collaboration, and compress time during concurrent
i,- i,- i,- i,- i,- i,- i,- i,-


design and construction
i,- i,-




Question:

traditional design build? i,- i,-




Answer:
typically two-phase best value procurement with lump sum contract;
i,- i,- i,- i,- i,- i,- i,- i,- i,-


owner defines project requirements and scope of prescriptive work; use of
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


performance-based technical requirements with limited prescriptive i,- i,- i,- i,- i,- i,-



specifications




Question:
progressive design build? i,- i,-




Answer:

, design and price are progressively developed after the design-builder is
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


under contract; final project cost and schedule commitment is not
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


established as part of the selection process; two phases: preliminary
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


services and final design and construction services
i,- i,- i,- i,- i,- i,-




Question:

criteria documents? i,-




Answer:

describe the end result i,- i,- i,-




Question:

bridging documents? i,-




Answer:
prescribes how to achieve the end result
i,- i,- i,- i,- i,- i,-




Question:

design bid build paradigm?
i,- i,- i,-




Answer:

prior to bidding, owner undertakes a process to design the project and all
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


of its details to 100% complete plans and specs. the owner is therefore
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


responsible for success or failure of details of the design, and warrants the
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


sufficiency of design to the contractor. the owner is therefore liable to the
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-

Document information

Uploaded on
September 2, 2026
Number of pages
37
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AcademiaExpert
3.8
(517)
Sold
2008
Followers
767
Items
4537
Last sold
18 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions