Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 22 pages
Exam (elaborations)

QSP COMPREHENSIVE EXAMINATION TEST QUESTIONS AND SOLUTIONS FULLY VERIFIED

Document preview thumbnail
Preview 3 out of 22 pages

QSP COMPREHENSIVE EXAMINATION TEST QUESTIONS AND SOLUTIONS FULLY VERIFIED

Content preview

QSP COMPREHENSIVE EXAMINATION TEST
QUESTIONS AND SOLUTIONS FULLY
VERIFIED

●● Any construction or demolition activity, including, but not limited to,
clearing, grading, grubbing, or excavation, or any other activity that
results in a land DISTURBANCE of equal to or greater than ___ acre
Answer: 1


●● LUPs
Answer: Linear Underground/Overhead Utility Projects


●● What is the primary federal law governing storm water pollution and
regulation
Answer: Clean Water Act


●● The person in charge of the utility company, municipality, or other
public or private company or agency that owns or operates the ____ may
also serve as the LRP
Answer: LUP


●● Visual Monitoring is required for...
Answer: All sites subject to this General Permit

,●● Records are required to remain onsite during the construction period
for a minimum of ___
Answer: 3 Years


●● When does Risk Level 1 site have to sample?
Answer: When required for non-visible pollutants


●● When would receiving water monitoring occur?
Answer: Effluent that exceeds the receiving water monitoring triggers
contained in the GP and with direct discharges to receiving water


●● When would bioassessment sampling take place?
Answer: RISK level 3 and LUP Type 3 Sites larger than 30 acres and
with direct discharges to receiving waters. (before and after sire
completion)


●● Where do records need to be available?
Answer: At the construction site until construction is complete. LUPs
may be retained in a crew members vehicle and made available upon
request


●● ATS
Answer: Active Treatment Systems

, ●● What do ATS do?
Answer: Add chemicals to facilitate flocculation, coagulation and
filtration of suspended sediment particles. Measured by NELs


●● When does risk level 1 site have to sample
Answer: When required for non-visible pollutants


●● Which construction activity is not covered under the CGP
Answer: Routine maintenance to maintain original line and grade,
hydraulic capacity, or original purpose of the facility


●● When is the primary federal law governing storm water pollution and
regulation?
Answer: Clean Water Act


●● The LRP's (Legally Responsible Person) approved signatory must
be:
Answer: Corporation - A responsible corporate officer
Partnership/sole proprietorship - general partner/proprietor
Municipality/State/federal/public agency
Military

Document information

Uploaded on
August 30, 2026
Number of pages
22
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TopGradeInsider
4.2
(13)
Sold
150
Followers
2
Items
52991
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions