• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

California UST Service Technician Part 1 | Exam Questions & Study Guide

Document preview thumbnail
Preview 2 out of 5 pages

California UST Service Technician Part 1 study resource featuring practice questions and exam review materials covering underground storage tank systems, service procedures, safety, compliance, equipment, and California UST requirements.

Content preview

California UST Service Technician part 1
A written statement indicating SIR results must be submitted to the ____every____ - ANS-Local
agency , 12 months

According to EO VR 101 E maintance records are required to include? - ANS-Name and
designated UST operator .

According to EO VR 201 A What could cause a nozzle shut off mechanism or malfunction? -
ANS-Depended filter seal damage

According to EO VR 2010 after installing a new spout assembly in the Healy 900 nozzle the
following test must be conducted ? - ANS-Nozzle dispensing shut off test

According to Healy EO VR 201 A a vapor recovery record are to be maintained by? -
ANS-Gasoline dispensing facility operator
(GDF)

According to PEI RP 300 a combustible gas can be used to ? - ANS-Detect vapor leaks in a
vapor recovery system.

According to PEI RP 300 as built drawing or pictures of the underground pipping and other
components shall be ? - ANS-Maintained as long as UST is in service

According to PEI RP 300 the following method of documenting piping location is NOT to ? -
ANS-Sketch a diagram on the inside cover of vapor recovery equipment manual

According to PEI RP 300. A written scope of work for vapor recovery installation should include?
- ANS-Construction plans

According to the health and safety code the owner of a new tank must conduct a one time ELD
test if the tank is located within 1000 ft of a public drinking water well. This test must
accomplished by ? - ANS-January 1, 2005

According to title 23; the following piping components if installed after July 1 1987 must have
secondary containment - ANS-Pressured product piping

According to VR 201 A Breakaway reconnection must be ? - ANS-Logged in GDF log

An approved method for non visual monitoring for existing UST systems. - ANS-Statistical
Inventory Reconciliation (SIR)

, An unauthorized release which does not escape secondary containment, requires only
recordation on the Operators Manual Report provided. - ANS-It did not cause deterioration of
secondary containment.
It did not increase the hazard of fire.
It was cleaned up within eight hours addicti it was cleaned up within eight hours detection.

ATG must be capable for detecting a release of ? - ANS-.2 gallons per hour

ATG should be programmed to test the tank ? - ANS-At least monthly

Automatic line leak detectors installed on underground piping with secondary containment shall
be capable of tetecting a leak of ? - ANS-3 gallons per hour at 10 psi

Cathodic protection systems must be tested within ____Months of installation and every
____months thereafter. - ANS-6, 36

Considered "pipe" on tanks installed after July 1 2003 - ANS-Pressured product piping and
below ground vapor recovery

Enhanced the detections results must be submitted to ___ within ___days - ANS-The local
agency and State water resources control Board.
60

how many feet within a public drinking well require an enhanced leak detection test - ANS-1000
feet

ICC cert must be renewed every? - ANS-24 months

If An authorize release meets reporting requirements of title 23 section 2652 the report must be
filed within the? - ANS-Local agency

If an unauthorized product release meets the requirements for reporting to the local agency,
verbal notification must be made within ____hours, followed by a written notification within
____days. - ANS-24, 5

If equipped with an over fill alarm, it must be located? - ANS-So it can be seen or heard from the
delivery location.

If installed, the following requires independent 3rd party certification to prove compliance with
established regulations. - ANS-Automatic Tank Gauge
Liquid Product Detectors
SIR

Document information

Uploaded on
August 19, 2026
Number of pages
5
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
nurshingschools
4.8
(495)
Sold
1263
Followers
2
Items
764
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions