Exam (elaborations)

NYC DCAS Construction Project Manager 300 Original Practice Questions with Marked Answers & Rationales

Document preview thumbnail
Preview 4 out of 65 pages

NYC DCAS Construction Project Manager 300 Original Practice Questions with Marked Answers & Rationales Topics: project delivery • contracts • CPM • scheduling • procurement • cost control • changes • quality • safety • risk • claims • documentation • closeout  1. A public owner wants one entity to take responsibility for both design coordination and constructionexecution. Which delivery method best fits? A. Design-Bid-Build B. Design-Build CORRECT ANSWER C. Multiple Prime Contracting D. Construction Manager as Advisor Rationale: Design-Build places design and construction responsibility under one contractual entity, reducing owner coordination between separate design and construction contracts. 2. A contractor discovers an undocumented underground utility that materially affects excavation. Whatshould the project manager do first? A. Immediately approve extra payment B. Direct the contractor to absorb the cost C. Review contract provisions, site information, and available evidence CORRECT ANSWER D. Terminate the contractor Rationale: The entitlement question must be evaluated against the contract, site information, differing-site-condition provisions, and documented facts before compensation is determined. 3. The primary purpose of Critical Path Method scheduling is to: A. Eliminate all project risk B. Determine labor rates C. Identify activities controlling the completion date CORRECT ANSWER D. Calculate contractor profit Rationale: CPM identifies the sequence of schedule-sensitive activities that controls project completion and helps management focus attention on critical work. 4. Which document most directly establishes the contractual scope and obligations between owner andcontractor? A. Daily report B. Meeting agenda C. Shop drawing D. Construction contract documents CORRECT ANSWER Rationale: The contract documents collectively define scope, specifications, drawings, conditions, responsibilities, and other contractual requirements. 5. A noncritical activity uses all of its available float but the project finish date is unchanged. What doesthis indicate? A. Immediate project failure B. Automatic contractor default C. Reduced schedule flexibility CORRECT ANSWER D. Automatic entitlement to a time extension Rationale: When float is consumed, the activity has less flexibility. Future delays can more easily affect the critical path. 6. A formal change order is generally appropriate when: A. A contractor voluntarily hires more workers B. Minor market prices fluctuate C. Authorized scope, price, or time must be changed CORRECT ANSWER D. The manager wants cleaner notes Rationale: A change order formally modifies contractual requirements such as scope, compensation, schedule, or other agreed terms. 7. A key public procurement principle is: A. Restricting competition to preferred firms B. Selecting only by experience C. Using informal quotations for every project D. Promoting fair competition and best value consistent with law CORRECT ANSWER Rationale: Public procurement generally emphasizes fairness, competition, transparency, compliance, and responsible use of public funds. 8. A submittal is returned with comments requiring revision. What should the contractor generally do? A. Ignore the comments B. Revise and resubmit as required CORRECT ANSWER C. Start fabrication immediately D. Delete the submittal from the project record Rationale: A returned submittal with required revisions should be addressed and resubmitted through the established submittal process. 9. What is the main purpose of a project baseline schedule? A. To replace the contract B. To establish the approved reference for measuring schedule performance CORRECT ANSWER C. To guarantee no delays occur D. To determine employee salaries Rationale: The baseline provides the approved reference against which actual progress, delays, and forecast completion can be evaluated. 10. Which activity is most likely to be critical in a CPM network? A. An activity with large total float B. An activity with zero or near-zero total float CORRECT ANSWER C. An activity that is already completeD. An activity with no predecessor Rationale: Critical activities generally have zero or very limited float and directly influence the planned completion date. 11. A contractor submits an invoice for work not supported by field records. What is the best initial action? A. Pay it automatically B. Reject all future invoices C. Verify quantities and supporting documentation CORRECT ANSWER D. Increase the contract value Rationale: Payment review should be based on documented, measurable, and contractually eligible work. 12. Why are daily construction reports important? A. They replace the contract B. They provide contemporaneous records of site conditions and activities CORRECT ANSWER C. They guarantee payment D. They eliminate inspections Rationale: Daily reports create a contemporaneous record of manpower, equipment, weather, work performed, visitors, issues, and other project events. 13. A request for information (RFI) is primarily used to: A. Authorize final payment B. Seek clarification of contract documents CORRECT ANSWER C. Replace the contractor's schedule D. Set employee wages Rationale: An RFI provides a controlled method for obtaining clarification when drawings, specifications, or other contract information is unclear or conflicting. 14. Which document typically shows the contractor's planned sequence and timing of work? A. Schedule CORRECT ANSWER B. Purchase order receipt C. Safety poster D. Warranty certificate Rationale: The project schedule communicates planned activity sequence, durations, milestones, logic, and forecast dates. 15. A project manager notices repeated late submittals. What is the most effective management response? A. Ignore the pattern B. Document the issue and address its root cause and contractual impact CORRECT ANSWER C. Cancel the project D. Approve all submittals without review Rationale: Repeated late submittals should be documented, analyzed for cause and impact, and addressed through project controls and contract procedures. 16. What does schedule float represent? A. Contract price B. Time an activity can slip without affecting a defined schedule milestone CORRECT ANSWER C. Number of workersD. Material quantity Rationale: Float is the scheduling flexibility available before a specified successor or project milestone is affected. 17. A contractor claims a delay was caused by an owner-directed change. Which evidence is most useful? A. Rumors from workers B. Contemporaneous schedules, directives, records, and correspondence CORRECT ANSWER C. The contractor's advertising brochure D. Unrelated invoices Rationale: Delay analysis depends on reliable contemporaneous evidence showing the event, timing, responsibility, and schedule effect. 18. What is the purpose of a preconstruction meeting? A. To replace bidding B. To align project participants on procedures, responsibilities, communication, safety, schedule, and controls CORRECT ANSWER C. To approve final payment D. To close the project Rationale: A preconstruction meeting establishes common understanding of project administration and execution procedures before substantial work begins. 19. Which quality-control approach is most effective? A. Inspect only after final completion B. Prevent defects through planned procedures, inspections, testing, and documentation CORRECT ANSWER C. Avoid testing to save time D. Rely only on verbal assurances Rationale: Quality is best managed proactively through defined procedures, inspections, testing, documentation, and corrective action. 20. A concrete test result fails the specified strength requirement. What should happen first? A. Ignore it B. Review the specification, test validity, placement records, and required corrective procedure CORRECT ANSWER C. Immediately demolish everything D. Issue final payment Rationale: The result must be evaluated against the contract requirements and verified before deciding on acceptance, investigation, or corrective work. 21. What is the primary purpose of a punch list? A. List potential bidders B. Identify incomplete or deficient work requiring correction before closeout CORRECT ANSWER C. Set the original contract priceD. Replace the safety plan Rationale: A punch list identifies remaining corrective items so they can be completed and verified during closeout.

Content preview

NYC DCAS Construction Project Manager
300 Original Practice Questions with Marked
Answers & Rationales

Topics: project delivery • contracts • CPM • scheduling • procurement • cost control • changes •
quality • safety • risk • claims • documentation • closeout




Independent practice material — not an official NYC DCAS publication Page 1

, 1. A public owner wants one entity to take responsibility for both design coordination and
constructionexecution. Which delivery method best fits?
A. Design-Bid-Build
B. Design-Build ✓ CORRECT ANSWER
C. Multiple Prime Contracting
D. Construction Manager as Advisor

Rationale: Design-Build places design and construction responsibility under one contractual entity, reducing owner
coordination between separate design and construction contracts.


2. A contractor discovers an undocumented underground utility that materially affects excavation.
Whatshould the project manager do first?
A. Immediately approve extra payment
B. Direct the contractor to absorb the cost
C. Review contract provisions, site information, and available evidence ✓ CORRECT ANSWER D. Terminate the
contractor

Rationale: The entitlement question must be evaluated against the contract, site information, differing-site-condition
provisions, and documented facts before compensation is determined.


3. The primary purpose of Critical Path Method scheduling is to:

A. Eliminate all project risk
B. Determine labor rates
C. Identify activities controlling the completion date ✓ CORRECT ANSWER
D. Calculate contractor profit

Rationale: CPM identifies the sequence of schedule-sensitive activities that controls project completion and helps
management focus attention on critical work.


4. Which document most directly establishes the contractual scope and obligations between owner
andcontractor?
A. Daily report
B. Meeting agenda
C. Shop drawing
D. Construction contract documents ✓ CORRECT ANSWER

Rationale: The contract documents collectively define scope, specifications, drawings, conditions, responsibilities, and
other contractual requirements.


5. A noncritical activity uses all of its available float but the project finish date is unchanged. What
doesthis indicate?
A. Immediate project failure
B. Automatic contractor default
C. Reduced schedule flexibility ✓ CORRECT ANSWER
D. Automatic entitlement to a time extension




Independent practice material — not an official NYC DCAS publication Page 2

, Rationale: When float is consumed, the activity has less flexibility. Future delays can more easily affect the critical path.


6. A formal change order is generally appropriate when:

A. A contractor voluntarily hires more workers
B. Minor market prices fluctuate
C. Authorized scope, price, or time must be changed ✓ CORRECT ANSWER
D. The manager wants cleaner notes

Rationale: A change order formally modifies contractual requirements such as scope, compensation, schedule, or other
agreed terms.


7. A key public procurement principle is:

A. Restricting competition to preferred firms
B. Selecting only by experience
C. Using informal quotations for every project
D. Promoting fair competition and best value consistent with law ✓ CORRECT ANSWER

Rationale: Public procurement generally emphasizes fairness, competition, transparency, compliance, and responsible use
of public funds.


8. A submittal is returned with comments requiring revision. What should the contractor generally do?

A. Ignore the comments
B. Revise and resubmit as required ✓ CORRECT ANSWER
C. Start fabrication immediately
D. Delete the submittal from the project record

Rationale: A returned submittal with required revisions should be addressed and resubmitted through the established
submittal process.


9. What is the main purpose of a project baseline schedule?

A. To replace the contract
B. To establish the approved reference for measuring schedule performance ✓ CORRECT ANSWER
C. To guarantee no delays occur
D. To determine employee salaries

Rationale: The baseline provides the approved reference against which actual progress, delays, and forecast completion
can be evaluated.


10. Which activity is most likely to be critical in a CPM network?

A. An activity with large total float
B. An activity with zero or near-zero total float ✓ CORRECT ANSWER
C. An activity that is already completeD. An activity with no predecessor

Rationale: Critical activities generally have zero or very limited float and directly influence the planned completion date.




Independent practice material — not an official NYC DCAS publication Page 3

, 11. A contractor submits an invoice for work not supported by field records. What is the best initial action?

A. Pay it automatically
B. Reject all future invoices
C. Verify quantities and supporting documentation ✓ CORRECT ANSWER
D. Increase the contract value

Rationale: Payment review should be based on documented, measurable, and contractually eligible work.


12. Why are daily construction reports important?

A. They replace the contract
B. They provide contemporaneous records of site conditions and activities ✓ CORRECT ANSWER
C. They guarantee payment
D. They eliminate inspections

Rationale: Daily reports create a contemporaneous record of manpower, equipment, weather, work performed, visitors,
issues, and other project events.


13. A request for information (RFI) is primarily used to:

A. Authorize final payment
B. Seek clarification of contract documents ✓ CORRECT ANSWER
C. Replace the contractor's schedule
D. Set employee wages

Rationale: An RFI provides a controlled method for obtaining clarification when drawings, specifications, or other contract
information is unclear or conflicting.


14. Which document typically shows the contractor's planned sequence and timing of work?

A. Schedule ✓ CORRECT ANSWER
B. Purchase order receipt
C. Safety poster
D. Warranty certificate

Rationale: The project schedule communicates planned activity sequence, durations, milestones, logic, and forecast
dates.


15. A project manager notices repeated late submittals. What is the most effective management response?

A. Ignore the pattern
B. Document the issue and address its root cause and contractual impact ✓ CORRECT ANSWER
C. Cancel the project
D. Approve all submittals without review

Rationale: Repeated late submittals should be documented, analyzed for cause and impact, and addressed through
project controls and contract procedures.


16. What does schedule float represent?




Independent practice material — not an official NYC DCAS publication Page 4

Document information

Uploaded on
August 16, 2026
Number of pages
65
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$24.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
2
Followers
1
Items
114
Last sold
5 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions