Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 58 pages
Exam (elaborations)

CDT 2 HIGH ACTUAL EXAM SOLVED QUESTIONS COMPLETE PREPARATION RESOURCE

Document preview thumbnail
Preview 4 out of 58 pages

CDT 2 HIGH ACTUAL EXAM SOLVED QUESTIONS COMPLETE PREPARATION RESOURCE

Content preview

CDT 2 HIGH-YIELD DENTAL ASSISTING SKILLS
AND CLINICAL PRACTICE SUMMARY 2026

◉ How long does a contractor required to execute corrections in the
Work after Substantial Completion.
Answer: one year


◉ "Which of the following would be included in Available
Information?


a. Bid security requirements
b. Environmental Impact Statement
c. Time of completion to construct the project
d. Description of the Work


Review: PDPG 11.4.5".
Answer: "b. Environmental Impact Statement


Available Information is the place to provide reference information
such as this that doesn't belong in the contract. Bid security info? In
the Instructions for Procurement. Time of Completion? It's
contractual - where would you put it? Description of Work? Name
the Division 01 section where that belongs."

,◉ "Instructions for Procurement:


a. Are used only on private projects
b. Frequently are standard industry forms
c. May include the geotechnical report as an attachment
d. Are binding upon the Contractor


Review: PDPG 11.4.4
".
Answer: "b. Frequently are standard industry forms


Both AIA and EJCDC offer standard printed Instructions to Bidders
forms. If necessary, a Supplementary Instructions to Bidders can
customize the Instructions to suit special project conditions.


Did you notice? The PDPG uses the term ""Instructions for
Procurement"" as an umbrella term for both bid and negotiated
projects. MasterFormat lists both terms: Instructions for
Procurement, and the more specific documents Instructions to
Bidders or Instructions to Proposers."


◉ "Marked-up or corrected contract drawings that indicate changes
incorporated in the Work are:

,a. Contract forms
b. Closeout submittals
c. Record drawings
d. As-builts
e. Not required for private work


Review: PDPG 11.2.3.5".
Answer: "c. Record drawings


These drawings incorporate all issued modifications and significant
field changes in scope. The term ""as-builts"" is discouraged, as we
are often unable to certify the accuracy of actual installations and
field-recorded information."


◉ "Contractual clauses in the Conditions of the Contract:


a. Have priority over Division 01
b. Are superseded by Division 01
c. Are expanded upon by the provisions of Division 01
d. Are independent, and Division 01 provisions have no effect

, Review: PDPG 11.2.9".
Answer: "c. Are expanded upon by the provisions of Division 01


The key word is ""expanded."" Division 01 General Requirements are
detailed. They address administrative and procedural level issues.
The Conditions of the Contract say: ""Do this."" The General
Requirements say: ""Do it like this."" And don't forget the concept of
""complementary documents."" No provisions have priority over, are
superseded by, or are independent of, other provisions in the
contract documents - they are ""complementary."""


◉ "In the specifications, the stated requirements address:


a. The owner's responsibilities
b. The contractor's responsibilities
c. The subcontractor's responsibilities
d. The architect's responsibilities
e. All of the above


Review: PDPG 11.3.4.3".
Answer: "b. The contractor's responsibilities


The owner and the contractor are the sole parties to the contract.
The requirements of the specifications address the contractor. Other

Document information

Uploaded on
August 16, 2026
Number of pages
58
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TopGradeInsider
4.2
(12)
Sold
144
Followers
1
Items
51004
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions