• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 3 pages
Other

CAPSTONE PROJECT INSTRUCTIONS

Document preview thumbnail
Preview 1 out of 3 pages

CAPSTONE PROJECT INSTRUCTIONS

Content preview

CAPSTONE PROJECT INSTRUCTIONS

The capstone project assesses the program outcomes through a conclusion information system
(IS) component that solves your client’s needs. Each phase of the project should include one
Microsoft Word document that follows APA guidelines and one zip file containing the
applicable programming code, development material, and/or system configuration.

Instructions for the capstone project are detailed below in three (3) phases.

Phase I Capstone Requirements

I. General Outline
a. APA formatted paper
b. Cover page
c. Table of Contents (TOC)
d. Introduction and conclusion sections
e. Each section must be well supported with the textbook, respected
industry whitepapers, and scholarly information systems journal articles
II. Project Solution
a. Zip file including all work completed for the customer associated with the
WBS that parallel the assigned modules/week. For example:
i. WBS indicates 10 project tasks will occur during the assigned weeks
leading up to the due date of this phase of the capstone, all code
necessary to complete these tasks is necessary to include for credit
b. All files/code/configurations must identify the author’s effort using
comment sections throughout. For example:
i. // Lines 0-50 written by Anna Anderson
ii. // Lines 50-100 written by Sam Smith
III. Biblical Worldview
a. Final project closeout will require Biblical worldview integration, begin
planning for this in the early stages of the project’s implementation
b. Identify several Biblical principles that apply to working in a coordinated
effort with others to achieve the solution
IV. Testing Evaluation Plan and Report
a. Create a plan for User Acceptance Testing (UAT)/evaluating the new IS.
b. Create a list of tasks that the user should be able to complete using the new IS.
The system should fulfil both the user requirements and support all business
and user scenarios.
V. User Acceptance Testing (UAT) Report
a. Observe the user utilizing the new IS system and the tasks that the user should
be able to complete using the new system. Take notes during testing.
b. Create an Excel spreadsheet to store the data collected during testing.

Document information

Uploaded on
July 22, 2026
Number of pages
3
Written in
2025/2026
Type
Other
Person
Unknown
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
flyhigher329
3.7
(61)
Sold
386
Followers
175
Items
18498
Last sold
5 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions