STORM WATER COMPLIANCE
CONSTRUCTION TEST PAPER COMPLETE
QUESTIONS AND ACCURATE ANSWERS
PREMIUM REVIEW SHEET
●● NPDES
Answer: Requirements for managing storm water activity on a
construction site are outlined in the following regulation
●● Discharge From Contaminated Ground Water
Answer: Never an allowable discharge from a construction site
●● A notice of termination can be filed when?
Answer: All construction activity, inside and outside of the building is
complete. Permanent stabilization has been verified.
●● The storm water notice of intent must be submitted?
Answer: After the SWPPP is prepared and before starting construction.
●● Potential pollutant sources stored on a construction site may include?
Answer: Petroleum storage tanks, fertilizer, lime, and masonry materials.
, ●● The SWPPP implementation sequence may be modified?
Answer: After consulting with the project SWPPP designer (CEC) and if
required, the project owner and receiving written approval.
●● A SWPPP site map will show all of the following?
Answer: Location of BMP's, Phasing & Sequence, Limits of
Disturbance
●● Which of the following information is to be posted at the entrance to
the site?
Answer: Construction site notice, permit authorization, location of
SWPPP
●● Which of the following is not a beneficial use water?
Answer: Flushing water down a storm drain
●● When installing and maintaining a check dam make sure...?
Answer: The low point (overflow) of the check dam is in the middle of
the channel
●● To reduce the possibility of undercutting in channels, you should?
Answer: Install filter fabric under rock & similar materials placed within
the storm water conveyance.
CONSTRUCTION TEST PAPER COMPLETE
QUESTIONS AND ACCURATE ANSWERS
PREMIUM REVIEW SHEET
●● NPDES
Answer: Requirements for managing storm water activity on a
construction site are outlined in the following regulation
●● Discharge From Contaminated Ground Water
Answer: Never an allowable discharge from a construction site
●● A notice of termination can be filed when?
Answer: All construction activity, inside and outside of the building is
complete. Permanent stabilization has been verified.
●● The storm water notice of intent must be submitted?
Answer: After the SWPPP is prepared and before starting construction.
●● Potential pollutant sources stored on a construction site may include?
Answer: Petroleum storage tanks, fertilizer, lime, and masonry materials.
, ●● The SWPPP implementation sequence may be modified?
Answer: After consulting with the project SWPPP designer (CEC) and if
required, the project owner and receiving written approval.
●● A SWPPP site map will show all of the following?
Answer: Location of BMP's, Phasing & Sequence, Limits of
Disturbance
●● Which of the following information is to be posted at the entrance to
the site?
Answer: Construction site notice, permit authorization, location of
SWPPP
●● Which of the following is not a beneficial use water?
Answer: Flushing water down a storm drain
●● When installing and maintaining a check dam make sure...?
Answer: The low point (overflow) of the check dam is in the middle of
the channel
●● To reduce the possibility of undercutting in channels, you should?
Answer: Install filter fabric under rock & similar materials placed within
the storm water conveyance.