Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 23 pages
Exam (elaborations)

Florida contractors exam test questions EXAMINATION COMPLETE PRACTICE QUESTIONS AND ANSWERS | VERIFIED SOLUTIONS | UPDATED 2026/2027 STUDY GUIDE

Document preview thumbnail
Preview 3 out of 23 pages

Florida contractors exam test questions EXAMINATION COMPLETE PRACTICE QUESTIONS AND ANSWERS | VERIFIED SOLUTIONS | UPDATED 2026/2027 STUDY GUIDE According to the AIA, what is the warranty that a contractor shall provide for his workmanship? - CORRECT ANSWER -One year According to AIA A201, within how many days must the contractor notify the architect after they notice a hidden condition that varies material from what was specified in the contract documents? - CORRECT ANSWER -14 days After contract negotiations concluded between the owner and architect, the architect performs the required site inspections and presents bill for $750 for his services. The owner then request an additional inspection to be performed at the site. The architect presents an additional bill for $750 for performance of the additional inspection. During the additional inspection, the architect finds a failure of compliance. How much does GC reimburse? - CORRECT ANSWER -$1500. The contractors responsible to pay all related cost of tests and approvals as required by the contract documents and is thus responsible for the $750 fee. However, the cost for any test that is requested once contract negotiations between the owner and contractors completed is a responsibility of the owner. Because the contractor failed the test the additional $750 fee is the responsibility of the contractor.

Content preview

Florida contractors exam test
questions EXAMINATION
COMPLETE PRACTICE
QUESTIONS AND
ANSWERS | VERIFIED
SOLUTIONS | UPDATED
2026/2027 STUDY GUIDE

According to the AIA, what is the warranty that a contractor shall
provide for his workmanship? - CORRECT ANSWER -One year



According to AIA A201, within how many days must the contractor
notify the architect after they notice a hidden condition that varies
material from what was specified in the contract documents? -
CORRECT ANSWER -14 days

,After contract negotiations concluded between the owner and
architect, the architect performs the required site inspections and
presents bill for $750 for his services. The owner then request an
additional inspection to be performed at the site. The architect
presents an additional bill for $750 for performance of the additional
inspection. During the additional inspection, the architect finds a
failure of compliance. How much does GC reimburse? - CORRECT
ANSWER -$1500. The contractors responsible to pay all related cost
of tests and approvals as required by the contract documents and is
thus responsible for the $750 fee. However, the cost for any test that
is requested once contract negotiations between the owner and
contractors completed is a responsibility of the owner. Because the
contractor failed the test the additional $750 fee is the responsibility
of the contractor.



In a project where architects, engineers, contractors, and
subcontractors are involved, who is generally responsible for the
building permits? - CORRECT ANSWER -Contractor



What are shop drawings, product data and samples considered,
according to the AIA? - CORRECT ANSWER -Not contract documents

, According to the AIA, what is a construction change directive? -
CORRECT ANSWER -Written order, prepared by the architect and
signed by the owner and architect



According to the AIA 201, Blank will not be included by the architect
for the cost of a change directive? - CORRECT ANSWER -Hand tool
rental cost



According to the AIA documents, when can the contractor see
payment for his retainage amount? - CORRECT ANSWER -Upon
issuance of the certificate of substantial completion



If a contractor is required to provide submittals in accordance with
the contract documents, then the contractor shall not perform that
portion of the work until Blank? - CORRECT ANSWER -The submittal
has been approved by the architect



Which of the following is not a cause for an architect to withhold a
certificate of payment? - CORRECT ANSWER -Damage done by the
owner to the contractor

Document information

Uploaded on
July 5, 2026
Number of pages
23
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
VERIFIEDPASS
4.3
(3)
Sold
28
Followers
3
Items
2114
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions