• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 17 pages
Exam (elaborations)

Pjm Generation Operation Exam |Comprehensive Q&A For Certification Succerss

Document preview thumbnail
Preview 3 out of 17 pages

PJM GENERATION OPERATION EXAM |COMPREHENSIVE Q&A FOR CERTIFICATION SUCCERSS

Content preview

1|Page



PJM GENERATION OPERATION EXAM
|COMPREHENSIVE Q&A FOR
CERTIFICATION SUCCERSS


What is the cap for price-based offers? - correct-answer -Price-based offers will

be capped at the lower of $2000/MWh or the corresponding cost-based offer

when costs are above $1000/MWh

Example:

If a unit's cost is $1500, the price offer can be no higher than $1500



If $800, price offer can be no higher than $1000



If $2200, price offer can be no higher than $2000




Real time real and reactive power telemetry: Generators participating in the PJM

market as... - correct-answer -capacity resources

,2|Page




Real time real and reactive power telemetry: Generators __ MW (Maximum

facility output) or larger - correct-answer -10MW




Real time real and reactive power telemetry: Generators greater than __ MW

(Maximum facility output) and connected at a bus operating at __ kV or greater -

correct-answer -1MW; 50 kV




Real time real and reactive power telemetry: Solar parks __MW (Maximum

Facility Output) or greater - correct-answer -3 MW




Real time real and reactive power telemetry: Distributed generators modeled less

than __ MW (Maximum Facility Output) - correct-answer -10 MW

, 3|Page


Real time real and reactive power telemetry: Public... - correct-answer -

Distribution Microgrid Generators




Real time real and reactive power telemetry: Generators that will also participate

as PJM _____________ when they will reduce load and have PJM-approved

interconnection rights to inject power. - correct-answer -Demand Response

Resources




What are the real-time data requirements for a Mixed Technology Facility that is

directly connected to PJM transmission and has a Maximum Facility Output of

75MW or greater, or otherwise is a BES generator? - correct-answer -MW and

MVAR must be measured at the high-side of the generator step-up transformer. If

the transformer is modeled in the PJM EMS (e.g., for units 20MW and greater),

MW and MVAR must also be measured at the low-side of the generator step-up

transformer

Document information

Uploaded on
June 8, 2026
Number of pages
17
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$16.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Isladoc
3.8
(13)
Sold
115
Followers
0
Items
9239
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions