Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 34 pages
Exam (elaborations)

TEXAS ON-SITE SEWAGE FACILITY (OSSF) INSTALLER II EXAM VERIFIED QUESTIONS AND DETAILED SOLUTIONS LATEST UPDATE THIS YEAR-JUST RELEASED.PDF .||NEWEST EXAM!!!

Document preview thumbnail
Preview 4 out of 34 pages

Texas On-Site Sewage Facility (OSSF) Installer II license covers four critical domains. Mastery of these areas is essential for passing the TCEQ computer-based examination. 1. Regulatory & Administrative Rules (25%)  TCEQ Chapter 285: Detailed knowledge of Texas state laws governing sewage disposal.  Licensing Authority: Scope of work for Installer II vs. Installer I; apprentice supervision rules.  Permitting & Inspections: The role of the Authorized Agent (AA) and Designated Representative (DR), and the "Notice to Approve for Use" process.  Administrative Compliance: Maintenance contract requirements, 14-day reporting rules, and emergency repair protocols. 2. Technical System Design & Installation (35%)  Advanced Systems: Installation of Aerobic Treatment Units (ATUs), Low-Pressure Dosing (LPD), Drip Irrigation, and Mound systems.  Tanks & Components: Tank buoyancy, H-20 traffic loading, baffle/tee placement, and pump tank reserve capacity.  Materials & Specs: Pipe ratings (SDR 26/Schedule 40), purple pipe for reclaimed water, and gravel-less/chamber system credits.  Hydraulics: Total Dynamic Head (TDH), pump "short-cycling," and siphon prevention (vacuum breakers). 3. Site Evaluation & Soil Science (25%)  Soil Classification: Identifying Class I (Sand) through Class IV (Heavy Clay) and their respective Application Rates (Ra).  Restrictive Horizons: Identifying "depth to bedrock" and the seasonal high-water table through redoximorphic features (mottling).  Setback Requirements: Memorizing horizontal separation distances from wells (50/100ft), property lines (5/20ft), and public waterways (75ft).  Soil Substitution: Technical requirements for replacing Class IV soils with suitable media. 4. Calculations & Safety (15%)  Sizing Math: Calculating daily usage (GPD) based on bedrooms/square footage and determining absorption area (Area = GPD / Ra).  Geometric Formulas: Solving for square footage in rectangular trenches and circular spray patterns.  Operational Safety: Managing hazardous gases (), electrical safety (separate alarm circuits), and mandatory safety lids for child protection.  Disinfection: Calculating chlorine residual (0.1 mg/l minimum) and understanding the dangers of stabilized pool chlorine. 1. A homeowner wants to install a se

Content preview

TEXAS ON-SITE SEWAGE FACILITY (OSSF)
INSTALLER II EXAM VERIFIED QUESTIONS
AND DETAILED SOLUTIONS LATEST
UPDATE THIS YEAR-JUST RELEASED.PDF
.||NEWEST EXAM!!!

Overview Coverage
The 150-question bank for the Texas On-Site Sewage Facility (OSSF) Installer
II license covers four critical domains. Mastery of these areas is essential for passing
the TCEQ computer-based examination.
1. Regulatory & Administrative Rules (25%)
 TCEQ Chapter 285: Detailed knowledge of Texas state laws governing sewage
disposal.
 Licensing Authority: Scope of work for Installer II vs. Installer I; apprentice supervision
rules.
 Permitting & Inspections: The role of the Authorized Agent (AA) and Designated
Representative (DR), and the "Notice to Approve for Use" process.
 Administrative Compliance: Maintenance contract requirements, 14-day reporting
rules, and emergency repair protocols.
2. Technical System Design & Installation (35%)
 Advanced Systems: Installation of Aerobic Treatment Units (ATUs), Low-Pressure
Dosing (LPD), Drip Irrigation, and Mound systems.
 Tanks & Components: Tank buoyancy, H-20 traffic loading, baffle/tee placement, and
pump tank reserve capacity.
 Materials & Specs: Pipe ratings (SDR 26/Schedule 40), purple pipe for reclaimed
water, and gravel-less/chamber system credits.
 Hydraulics: Total Dynamic Head (TDH), pump "short-cycling," and siphon prevention
(vacuum breakers).
3. Site Evaluation & Soil Science (25%)
 Soil Classification: Identifying Class I (Sand) through Class IV (Heavy Clay) and their
respective Application Rates (Ra).

, Restrictive Horizons: Identifying "depth to bedrock" and the seasonal high-water table
through redoximorphic features (mottling).
 Setback Requirements: Memorizing horizontal separation distances from wells
(50/100ft), property lines (5/20ft), and public waterways (75ft).
 Soil Substitution: Technical requirements for replacing Class IV soils with suitable
media.
4. Calculations & Safety (15%)
 Sizing Math: Calculating daily usage (GPD) based on bedrooms/square footage and
determining absorption area (Area = GPD / Ra).
 Geometric Formulas: Solving for square footage in rectangular trenches and circular
spray patterns.
 Operational Safety: Managing hazardous gases (), electrical safety (separate alarm
circuits), and mandatory safety lids for child protection.
 Disinfection: Calculating chlorine residual (0.1 mg/l minimum) and understanding the
dangers of stabilized pool chlorine.


1. A homeowner wants to install a septic tank on their property. What is the
minimum required separation distance between the septic tank and a private
water well?
A) 10 feet
B) 25 feet
C) 50 feet
D) 100 feet
The tank itself requires a 50-foot setback. However, the disposal area (drainfield) must
be 100 feet away from the well to prevent groundwater contamination.
2. Which of the following activities is an OSSF Installer II authorized to perform
that an Installer I cannot?
A) Repair a broken gravity pipe
B) Install a standard 1,000-gallon septic tank
C) Install an Aerobic Treatment Unit (ATU) or pressure-dosed system
D) Perform a site evaluation for a commercial property
Installer II's are licensed to install all types of OSSF systems, including complex
aerobic and pressure-distributed systems. Installer I's are limited to "standard" systems
only.
3. According to TCEQ Chapter 285, what is the minimum liquid capacity for a
septic tank serving a 4-bedroom home that is 3,200 square feet?

,A) 750 gallons
B) 1,000 gallons
C) 1,250 gallons
D) 1,500 gallons
For a residence with 4 bedrooms (or between 3,501–4,500 sq. ft.), the minimum
capacity required is 1,250 gallons.
4. When evaluating a site for a new system, you discover the soil is a Class IV
(heavy clay). Which of the following is true?
A) It is the best soil for a standard drainfield
B) It has a high percolation rate
C) It is considered unsuitable for a standard soil substitution drainfield
D) It does not require a Professional Engineer's design
Class IV soils (clays) have poor drainage and high "shrink-swell" potential. Because
they don't absorb effluent well, they usually require non-standard systems like ATUs or
ET beds.
5. What is the maximum allowable slope for a standard OSSF disposal area
without requiring a special design by a Professional Engineer (PE)?
A) 15%
B) 20%
C) 30%
D) 45%
TCEQ rules state that a standard system cannot be installed on a slope
exceeding 30% because effluent may "break out" of the surface or flow too quickly to be
treated.
6. Which pipe material and rating is the minimum requirement for the line leading
from the house to the septic tank?
A) Thin-wall PVC
B) Schedule 20 PVC
C) 3-inch SDR 26 or Schedule 40 PVC
D) 4-inch corrugated HDPE
To prevent crushing and leaks, the "stub-out" to the tank must be at least 3 inches in
diameter and made of heavy-duty SDR 26 or Schedule 40 pipe.
7. For an Aerobic Treatment Unit (ATU) that uses surface application (spray
irrigation), what is the minimum required chlorine residual that must be
maintained in the pump tank?
A) 0.01 mg/l

, B) 0.1 mg/l
C) 1.0 mg/l
D) 5.0 mg/l
The effluent must be disinfected before surface application. TCEQ requires a minimum
chlorine residual of 0.1 mg/l to ensure pathogens are killed before the water is sprayed.
8. Which component is required to be installed in a pump tank to alert the owner
if the pump fails or the water level gets too high?
A) A secondary pump
B) A check valve
C) An audiovisual alarm on a separate circuit
D) A pressure gauge
An audiovisual alarm (light and buzzer) is mandatory. It must be on a separate
branch circuit from the pump so that if the pump trips its breaker, the alarm will still
have power to notify the owner.
9. What is the minimum required distance between a spray head (surface
application) and a property line?
A) 5 feet
B) 20 feet
C) 50 feet
D) 75 feet
To prevent "overspray" onto neighboring lots, spray heads must be set back at least 20
feet from property lines. This can be reduced to 10 feet if specific physical barriers are
present.
10. When installing a tank in an area with a high-water table, what is the primary
concern for the installer?
A) The tank will get too cold
B) Tank buoyancy (the tank "floating" out of the ground)
C) Increased bacterial growth
D) Excessive evaporation
An empty or partially empty tank in saturated soil acts like a boat. Buoyancy can cause
the tank to "pop" or float out of the ground, rupturing the pipes. Installers must use
anchors or "deadmen" to secure it.
11. Which of the following is a requirement for the "trash tank" (pretreatment
tank) located in front of an ATU?
A) It must be at least 2,000 gallons
B) It must have a mechanical aerator

Document information

Uploaded on
May 1, 2026
Number of pages
34
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$35.00

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
174
Followers
6
Items
2135
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions