Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

SOIL AND EROSION CONTROL QUESTIONS AND ANSWERS

Rating
-
Sold
-
Pages
14
Grade
A+
Uploaded on
01-05-2026
Written in
2025/2026

SOIL AND EROSION CONTROL QUESTIONS AND ANSWERS

Institution
NPDES
Course
NPDES

Content preview

SOIL AND EROSION CONTROL
QUESTIONS AND ANSWERS

National Pollutant Discharge Elimination System Permit - ans-
sq sq sq sq sq sq sq




Regulates storm water discharges and requires compliance with the General Permit; regul
sq sq sq sq sq sq sq sq sq sq sq




ates discharges from construction sites that disturb 1 acre or more of soil. Requires permite
sq sq sq sq sq sq sq sq sq sq sq sq sq sq




es to implement specific water quality sampling and analytical procedures.
sq sq sq sq sq sq sq sq sq




State Water Resources Control Board - ans-
sq sq sq sq sq sq




Issued the NPDES Permit, Statewide Storm Water Permit and Waste Discharge Requirem
sq sq sq sq sq sq sq sq sq sq sq




ents for the State of CA
sq sq sq sq sq




Water Pollution Control Program (WPCP) - ans-
sq sq sq sq sq sq




Includes a combination of soil stabilization and sediment controls.
sq sq sq sq sq sq sq sq




Construction Site BMP (temporary control practices) - ans-Best conventional/
sq sq sq sq sq sq sq sq




available technology, six categories: sq sq sq




1 - temporary soil stabilization
sq sq sq sq




2 - temporary sediment control
sq sq sq sq




3 - wind erosion control
sq sq sq sq




4 - tracking control
sq sq sq




5 - non-storm water Managment
sq sq sq sq




6 - waste Managment and materials pollution control
sq sq sq sq sq sq sq




Temporary Soil Stabilization Measures - ans- sq sq sq sq sq




Consists of preparing the soil surface and applying a BMP to disturbed soil areas.
sq sq sq sq sq sq sq sq sq sq sq sq sq




- Scheduling
sq




- Preservation of Existing Vegetation
sq sq sq sq




- Hydraulic Mulch
sq sq




- Hydroseeding
sq




- Soil Binders
sq sq




- Straw Mulch
sq sq




- Geotextiles, Plastic covers, and erosion control blankets/mats
sq sq sq sq sq sq sq




- Wood Mulching
sq sq




- Earth Dikes/Drainage Swales and Lined Ditches
sq sq sq sq sq sq




- Outlet Protection/Velocity Dissipation Devices
sq sq sq sq

, - Sloped Drains
sq sq




- Streambank Stabilization
sq sq




Scheduling - ans- sq sq




Developing a sequence of construction activities with implementation of BMPs; purpose is sq sq sq sq sq sq sq sq sq sq sq sq




to reduce the amount and duration of soil exposed to erosion by wind, rain, runoff, and vehi
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




cle tracking. sq




BMP objectives: soil stabilization, sediment control, tracking control, wind erosion control,
sq sq sq sq sq sq sq sq sq sq sq




non-storm water management, materials and waste management. sq sq sq sq sq sq




Very first step in effective storm water program; shall clearly show how the rainy season rel
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




ates to soil-disturbing and re-stabilization activities.
sq sq sq sq sq




Preservation of Existing Vegetation - ans- sq sq sq sq sq




Identification and protection of desirable vegetation that provides erosion and sediment co sq sq sq sq sq sq sq sq sq sq sq




ntrol benefits; limits of disturbance.
sq sq sq sq




BMP objective is for sediment control and non-storm water management.
sq sq sq sq sq sq sq sq sq




Temporary fencing shall be provided prior to clearing, especially on areas designation Envi
sq sq sq sq sq sq sq sq sq sq sq sq




ronmentally Sensitive Areas (ESAs); may limit the area available for construction activities. sq sq sq sq sq sq sq sq sq sq sq




Equipment and vehicles shall be kept away from trees; fires are not permitted within 100' of
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




the drip line of any retained trees; no toxic or construction materials shall be stored within 5
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




0 feet of the dripline of any retained trees.
sq sq sq sq sq sq sq sq




Trenching and Tunneling - ans- sq sq sq sq




Shall be as far away as possible, usually outside the dripline or canopy. Curve around trees
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq s




to avoid large roots.
q sq sq sq




If roots are encountered, consider tunneling under them, at least 18 inches below the groun
sq sq sq sq sq sq sq sq sq sq sq sq sq sq




d surface, and not below the tree center.
sq sq sq sq sq sq sq




Temporary Fencing - ans- sq sq sq




Orange polypropylene that is stabilized against ultraviolet light; shall be at least 1 meter (3.
sq sq sq sq sq sq sq sq sq sq sq sq sq sq




2 feet) tall, and shall have openings no larger than 2"x2".
sq sq sq sq sq sq sq sq sq sq sq




Fence posts shall be wood or metal, with adequate spacing to completely support fence in
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




an upright position.sq sq




Removed last, after all other work is complete. sq sq sq sq sq sq sq




Hydraulic Mulch - ans- sq sq sq




Applying a mixture of shredded wood fiber and stabilizing emulsion or tackifier with hyrdos
sq sq sq sq sq sq sq sq sq sq sq sq sq




eeding equipment, which temporarily protects exposed soil from erosion by rain or wind.
sq sq sq sq sq sq sq sq sq sq sq sq

Written for

Institution
NPDES
Course
NPDES

Document information

Uploaded on
May 1, 2026
Number of pages
14
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$14.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Thumbnail
Package deal
NPDES Level 1A Practice Test 2025/2026 – 100+ Questions on BMPs, Soil Erosion, Sediment Control, Permit Rules & Georgia State Compliance
-
8 2026
$ 56.07 More info

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
DeligentSuccess Chamberlain College Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
18
Member since
10 months
Number of followers
1
Documents
1024
Last sold
2 weeks ago
Deligent testbanks store:

Welcome to deligent success:where we offer high-quality test banks and study materials designed to help you excel academically. Deligent, hard work, perseverance, excellence are the values that cause things to happen.”

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions