QUESTIONS AND ANSWERS
National Pollutant Discharge Elimination System Permit - ans-
sq sq sq sq sq sq sq
Regulates storm water discharges and requires compliance with the General Permit; regul
sq sq sq sq sq sq sq sq sq sq sq
ates discharges from construction sites that disturb 1 acre or more of soil. Requires permite
sq sq sq sq sq sq sq sq sq sq sq sq sq sq
es to implement specific water quality sampling and analytical procedures.
sq sq sq sq sq sq sq sq sq
State Water Resources Control Board - ans-
sq sq sq sq sq sq
Issued the NPDES Permit, Statewide Storm Water Permit and Waste Discharge Requirem
sq sq sq sq sq sq sq sq sq sq sq
ents for the State of CA
sq sq sq sq sq
Water Pollution Control Program (WPCP) - ans-
sq sq sq sq sq sq
Includes a combination of soil stabilization and sediment controls.
sq sq sq sq sq sq sq sq
Construction Site BMP (temporary control practices) - ans-Best conventional/
sq sq sq sq sq sq sq sq
available technology, six categories: sq sq sq
1 - temporary soil stabilization
sq sq sq sq
2 - temporary sediment control
sq sq sq sq
3 - wind erosion control
sq sq sq sq
4 - tracking control
sq sq sq
5 - non-storm water Managment
sq sq sq sq
6 - waste Managment and materials pollution control
sq sq sq sq sq sq sq
Temporary Soil Stabilization Measures - ans- sq sq sq sq sq
Consists of preparing the soil surface and applying a BMP to disturbed soil areas.
sq sq sq sq sq sq sq sq sq sq sq sq sq
- Scheduling
sq
- Preservation of Existing Vegetation
sq sq sq sq
- Hydraulic Mulch
sq sq
- Hydroseeding
sq
- Soil Binders
sq sq
- Straw Mulch
sq sq
- Geotextiles, Plastic covers, and erosion control blankets/mats
sq sq sq sq sq sq sq
- Wood Mulching
sq sq
- Earth Dikes/Drainage Swales and Lined Ditches
sq sq sq sq sq sq
- Outlet Protection/Velocity Dissipation Devices
sq sq sq sq
, - Sloped Drains
sq sq
- Streambank Stabilization
sq sq
Scheduling - ans- sq sq
Developing a sequence of construction activities with implementation of BMPs; purpose is sq sq sq sq sq sq sq sq sq sq sq sq
to reduce the amount and duration of soil exposed to erosion by wind, rain, runoff, and vehi
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq
cle tracking. sq
BMP objectives: soil stabilization, sediment control, tracking control, wind erosion control,
sq sq sq sq sq sq sq sq sq sq sq
non-storm water management, materials and waste management. sq sq sq sq sq sq
Very first step in effective storm water program; shall clearly show how the rainy season rel
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq
ates to soil-disturbing and re-stabilization activities.
sq sq sq sq sq
Preservation of Existing Vegetation - ans- sq sq sq sq sq
Identification and protection of desirable vegetation that provides erosion and sediment co sq sq sq sq sq sq sq sq sq sq sq
ntrol benefits; limits of disturbance.
sq sq sq sq
BMP objective is for sediment control and non-storm water management.
sq sq sq sq sq sq sq sq sq
Temporary fencing shall be provided prior to clearing, especially on areas designation Envi
sq sq sq sq sq sq sq sq sq sq sq sq
ronmentally Sensitive Areas (ESAs); may limit the area available for construction activities. sq sq sq sq sq sq sq sq sq sq sq
Equipment and vehicles shall be kept away from trees; fires are not permitted within 100' of
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq
the drip line of any retained trees; no toxic or construction materials shall be stored within 5
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq
0 feet of the dripline of any retained trees.
sq sq sq sq sq sq sq sq
Trenching and Tunneling - ans- sq sq sq sq
Shall be as far away as possible, usually outside the dripline or canopy. Curve around trees
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq s
to avoid large roots.
q sq sq sq
If roots are encountered, consider tunneling under them, at least 18 inches below the groun
sq sq sq sq sq sq sq sq sq sq sq sq sq sq
d surface, and not below the tree center.
sq sq sq sq sq sq sq
Temporary Fencing - ans- sq sq sq
Orange polypropylene that is stabilized against ultraviolet light; shall be at least 1 meter (3.
sq sq sq sq sq sq sq sq sq sq sq sq sq sq
2 feet) tall, and shall have openings no larger than 2"x2".
sq sq sq sq sq sq sq sq sq sq sq
Fence posts shall be wood or metal, with adequate spacing to completely support fence in
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq
an upright position.sq sq
Removed last, after all other work is complete. sq sq sq sq sq sq sq
Hydraulic Mulch - ans- sq sq sq
Applying a mixture of shredded wood fiber and stabilizing emulsion or tackifier with hyrdos
sq sq sq sq sq sq sq sq sq sq sq sq sq
eeding equipment, which temporarily protects exposed soil from erosion by rain or wind.
sq sq sq sq sq sq sq sq sq sq sq sq