• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 41 pages
Exam (elaborations)

Cts Exam 3 2026 Question Collection Av Installation And Troubleshooting Module Solved Items And Response Key

Document preview thumbnail
Preview 4 out of 41 pages

CTS EXAM 3 2026 QUESTION COLLECTION AV INSTALLATION AND TROUBLESHOOTING MODULE SOLVED ITEMS AND RESPONSE KEY

Content preview

CTS EXAM 3 2026 QUESTION COLLECTION
AV INSTALLATION AND TROUBLESHOOTING
MODULE SOLVED ITEMS AND RESPONSE KEY

◉ What type of project is a typical Consultant-Led Design-Bid-Build
contract structure good for? Answer: Long term projects with
extended project cycles


◉ What is the risk in using an OFE/Integrator Installed contract
structure? Answer: System and infrastructure design and facility
functionality may suffer


◉ What are some of the important project scope and size
considerations in selecting an AV provider? Answer: Financial
Stability, Current Workload, and Company Credentials


◉ What type of document typically includes Project Size
Requirements, Corporate Profile, Team Personnel, and Warranty
Response Time? Answer: RFQ


◉ a significant difference between the Two-Envelope Bid
Method and the Qualifications- Based Selection Method? Answer:
Negotiate with the highest ranking firm to finalize the contract

,◉ What is one of the disadvantages of contracting the AV integrator
to the electrical
subcontractor? Answer: More layers of responsibility and
communication


◉ When conducting a complete project bid process, what milestone
follows the issuing of the RFP? Answer: Pre-Bid Meeting


◉ Under what circumstances would you likely use an A305-1986
form? Answer: Scoring responses to an RFQ


◉ What is the ideal way to contract an AV integrator? Answer:
Directly to the Owner


◉ The process of identifying the activities that end-users need to
perform, and developing the functional descriptions of your systems
is referred to as:? Answer: Needs Analysis


◉ What is the main task of the third Step of the Program Phase of a
Project? Answer: Conducting program meetings


◉ What should be included in the written Program Report? Answer:
...A conceptual and functional system description

,◉ The more accurate means to estimate dimensions of a commercial
space during a site inspection would be to? Answer: Count Ceiling
Tiles in a drop tile instalation


◉ A client requires a new boardroom. The sales person and engineer
are sent to the premises to measure the facility and talk to the client.
At this stage they should be performing a _ Answer: Needs Analysis


◉ Sightlines for audience viewing in a given presentation space can
be improved by: Answer: Providing a sloped, or stepped, seating
arrangement


◉ After presenting a proposal, what is the correct plan of action for
following up with the client? Answer: Regularly, until a decision is
made


◉ AV professionals determine the end user's needs by examining
three things: the required applications, the tasks, and the: Answer:
Functions to support the applications


◉ When working with a client to design an AV solution for a new
conference center, the client requests a detailed budget for the
equipment and installation. What phase is the project in? Answer:
Design phase

, ◉ The HDTV aspect ratio is equal to which of the following? Answer:
1.78:1


◉ Please select the appropriate resolution for SXGA. Answer: 1280 x
1024


◉ The Brightness control adjusts which level? Answer: Black Level


◉ For what purpose would the AV technician designate a loopback
internet protocol address in the 127.0.0.1 to 127.255.255.254 range
in a network configuration? Answer: To test the local device to see if
TCP/IP is working on your system


◉ It is important to consider Polar Patterns when____ Answer:
Selecting Microphones for use at live events


◉ When training a new user how to operate the solution that has
been provided, which of the following is a best practice? Answer:
Provide complete user documentation prior to training


◉ What is a benefit of offering a free training session for a client
with new equipment? Answer: It is a positive approach for a long-
term partnership

Document information

Uploaded on
April 29, 2026
Number of pages
41
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
FocusFile7
4.0
(29)
Sold
299
Followers
4
Items
76015
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions