A programs flyaway cost covers this type of equipment using the
appropriation category. Ans✓✓✓prime mission equipment and
procurement
These are key tenets in accomplishing life cycle sustainment Ans✓✓✓1.
What are PSS, LCSP, continuing and regular reviews, revalidation, and
update of product support and sustainment strategies, including the
LCSP and the Business Case Analysis and single point accountability
for developing and delivering program product support objectives,
including sustainment
This document states that the life cycle support plan will be updated at
each decision point to reflect the increased maturity of the PSS< any
changes in the corresponding in the PSP, current risks, and any cost
reduction activities Ans✓✓✓DoDI 5000.91
This should be included in the PBL contract to achieve the target level of
performance Ans✓✓✓incentives
The SMART criteria for metrics stands for this Ans✓✓✓Specific,
Measurable, Attainable, Relevant, and Timely
Approximately this percent of software life cycle costs are incurred later
in the programs life cycle. Ans✓✓✓70%
, These statements reflect DOD guidance and best practice regarding
software acquisition Ans✓✓✓develop software systems architecture that
supports open systems and select a programming language that
influences overall life cycle costs, risks, and the potential for
interoperability
These mature software developers possess an organization wide ability
for well-managed, disciplined systems and software development that is
characterized by what Ans✓✓✓What are processes that are well-
defined, accurately communicated and followed; established systems to
measure processes and make any needed improvements and realistic
schedules and budgets based on historical performances
Software used from this source will increase the configuration
management challenges Ans✓✓✓third party or commercial
These are the three primary benefits of using COTS components in
system design. Ans✓✓✓reduce development time, allow faster insertion
of new technology, and lower life-cycle costs by taking advantage of the
more readily available and up to date commercial industrial base.
Joint Interoperability certification is mandatory for these types of
programs Ans✓✓✓are programs with relevant data exchange capability