VA DEQ Erosion and Sediment Control Inspector Exam – Virginia DEQ | Practice Questions with Verified Correct Answers

Document preview thumbnail
Preview 4 out of 31 pages

This document provides practice questions and correct answers for the Virginia DEQ Erosion and Sediment Control Inspector Exam. It covers essential topics such as erosion control measures, sediment management, regulatory compliance, and inspection procedures. The material is designed to support exam preparation and reinforce key concepts required for certification.

Content preview

VA DEQ EROSION AND SEDIMENT
CONTROL INSPECTOR EXAM –
VIRGINIA DEQ – PRACTICE
QUESTIONS AND CORRECT
ANSWERS 2026 GRADED A+
VESCP - answer-Virginia Erosion and Sediment Control Program



- Administered by counties/cities (must), towns (may)

- MUST BE APPROVED



Minimum Standard 1 - answer-Stabilization



permanent or temporary soil stabilization shall be applied to denuded areas within
seven days after final grade is reached on any portion of the site; temporary soil
stabilization shall be applied within seven days to denuded areas that may not be at
final grade but will remain dormant for longer than 14 days; permanent stabilization
shall be applied to areas that are to be left dormant for more than one year



Site NOT at Final Grade - answer-- stabilize in 14 days

- temporarily seed

- mulch

- permanently stabilize if dormant > 1 year



Site at Final Grade - answer-- stabilize in 7 days (recommended immediately)

- permanently or temporarily seed and mulch

- mulch/matting/straw



Minimum Standard 2 - answer-Stock Piles, Waste and Borrow Areas

,during construction, soil stock piles and borrow areas shall be stabilized or protected
with sediment trapping measures



mulch prevents erosion by protecting the surface from raindrop impact and silt fence
intercepts and detains from disturbed areas



Minimum Standard 3 - answer-Permanent Vegetation



permanent vegetation cover shall be established on denuded areas not otherwise
permanently stabilized (permanent vegetation shall not be considered established until
a ground cover is achieved that is uniform, mature enough to survive, and will inhibit
erosion *there is no % associated with this*)



reduce erosion and decrease sediment yield from disturbed area



this is the standard used to verify that a site is ready for release of bonds or surety



Minimum Standard 4 - answer-First-Step Measures



Sediment basins and traps, perimeter dikes, sediment barriers and other measures
intended to trap sediment shall be constructed as a first step in any land-disturbing
activity and shall be made functional before upslope land disturbance takes place



a certain amount of initial land disturbance may be required to provide access for
equipment to install the perimeter controls, but site clearing and grading should be kept
to a minimum until the perimeter controls are in place



intercepts and detains small amounts of sediment from disturbed areas during
construction operation to prevent sediment from leaving the site and decrease velocity
of sheet flows and low-to-moderate level channel flow

,Perimeter Controls - answer-assures that sediment does not leave the perimeter of the
land-disturbing area once site clearing, grading, and construction commences



Examples: silt fences, sediment traps, sediment basins, construction entrance,
temporary diversions, diversions



Minimum Standard 5 - answer-Earthen Structure Stabilization



stabilization measures shall be applied to earthen structures such as dams, dikes, and
diversions immediately after installation



reduce erosion and sedimentation and reduce damage from sediment and runoff to
downstream or off-site areas



Minimum Standard 6 - answer-Traps and Basins



sediment traps and basins shall be designed and constructed based upon the total
drainage area (not just disturbed area) to be served by the trap or basin



Sediment Traps - answer-minimum storage capacity shall be 134 cubic yards per acre of
drainage area and shall only control drainage areas less than 3 acres



*stone outlet = trap*



Sediment Basins - answer-surface runoff from disturbed areas that is comprised of flow
from drainage areas greater than or equal to 3 acres shall be controlled by a basin;
minimum storage capacity of a sediment basin shall be 134 cubic yards per acre of
drainage area; the outfall system shall, at a minimum, maintain the structural integrity
of the basin during a 25-year storm of 24-hour duration; runoff coefficients used in
runoff calculations shall correspond to a bare earth condition or those conditions
expected to exist while the sediment basin is utilized.

, Sediment Trapping Devises - answer-1. place near the lowest drainage points of a
project



2. install as a first-step measure [MS-4]



3. stabilize immediately [MS-5]



4. must include outlet protection for basins [MS-11]



Minimum Standard 7 - answer-Cut and Fill Slopes



roughening the surface of the slope decreases runoff, lowers the velocity runoff,
increases water retention, and leads to better seed germination



slopes that are found to be eroding excessively within on year of permanent stabilization
shall be provided with additional slop stabilizing measures until the problem is
corrected



Minimum Standard 8 - answer-Concentrated Runoff



shall not flow down cut or fill slopes unless contained within an adequate temporary or
permanent channel, flume or slope drain structure



outlets of these drains need outlet protection to prevent erosion from the concentrated
flow



size of pipe depends on drainage area

Document information

Uploaded on
March 31, 2026
Number of pages
31
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
lectshammah
3.0
(2)
Sold
8
Followers
0
Items
1076
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions