• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 77 pages
Exam (elaborations)

ICC General Requirements Exam 380+ (Latest Edition) 100% Verified Q&A + Answer Key Solutions

Document preview thumbnail
Preview 4 out of 77 pages

ICC General Requirements Exam 380+ (Latest Edition) 100% Verified Q&A + Answer Key Solutions

Content preview

ICC GENERAL REQUIREMENTS EXAM
380+ (Latest 2025-2026 Edition) 100% Verified Q&A + Answer Key Solutions




Question 1


Who can issue a stop work order?
Correct!

c.) building official




Question 2


Work that usually requires special inspection in the field but is instead performed off-site on the premises of a
Correct!
fabricator during fabrication...


c.) does not require special inspection if the fabricator is registered and approved




Question 3


All of the following should be on a daily report except...
Correct!

a.) astm standard for any testing performed.




Question 4


The final report shall be submitted...
Correct!

c.) at a point in time agreed upon by the owner and building official

, Question 5


Discrepancies or nonconforming items shall be brought to the immediate attention of the
Correct!

a.) contractor




Question 6


Who has the authority to enforce the special inspection provisions on a job?
Correct!

a.) contractor




Question 7


The type and extent of each special inspection and each test shall be located in...
Correct!

d.) the statement of special inspections




Question 8


contractor
Correct!

A person or company responsible for the construction of a building.




Question 9


building official
Correct!

An individual charged with the legal authority to review plans and specifications for code compliance.

, Question 10


approved inspection agency
Correct!

An organization authorized to conduct inspections and ensure compliance with building codes.




Question 11


registered design professional
Correct!

A qualified individual responsible for submitting revised plans to the building official for approval.




Question 12


special inspector
Correct!

A professional who checks in with the contractor upon arriving at the job site.




Question 13


preconstruction conference meeting
Correct!

A meeting aimed at reviewing the Special Inspection agreement and schedule requirements.




Question 14


final report
Correct!

A document submitted to the building department by the inspection agency or special inspector.

, Question 15


nonconformance inspection report
Correct!

A report that should include information about discrepancies but not the name of the project owner.




Question 16


approved agency
Correct!

An entity responsible for keeping records of special inspections and tests performed during construction.




Question 17


quality assurance
Correct!

Another name for special inspection.




Question 18


Engineer
Correct!

A professional employed by an owner to perform structural observations.




Question 19


Statement of Special Inspections
Correct!

A document prepared by the RDP in charge when special inspection is required.

Document information

Uploaded on
March 21, 2026
Number of pages
77
Written in
2025/2026
Type
Exam (elaborations)
Contains
Unknown
$11.17

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
564
Last sold
-



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions