100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

ACI CERTIFICATION – CONCRETE FIELD TESTING TECHNICIAN GRADE 1

Beoordeling
-
Verkocht
-
Pagina's
23
Cijfer
A+
Geüpload op
27-01-2026
Geschreven in
2025/2026

ACI CERTIFICATION – CONCRETE FIELD TESTING TECHNICIAN GRADE 1 ACI CERTIFICATION – CONCRETE FIELD TESTING TECHNICIAN GRADE 1 ACI CERTIFICATION – CONCRETE FIELD TESTING TECHNICIAN GRADE 1

Instelling
ACI CERTIFICATION
Vak
ACI CERTIFICATION










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
ACI CERTIFICATION
Vak
ACI CERTIFICATION

Documentinformatie

Geüpload op
27 januari 2026
Aantal pagina's
23
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

ACI CERTIFICATION – CONCRETE
FIELD TESTING TECHNICIAN
GRADE 1


Sampling Fresh Concrete: Collecting a representative sample of concrete
to be tested is as important as executing the test methods to obtain
_______________________________. - ANSWER- Accurate results
(Reference 1.2)


Sampling Fresh Concrete: This practice covers sampling from four types
of equipment , which are ________________________________,
________________________,
________________________________________, and
_____________________ ____________. - ANSWER- Stationary
mixers, paving mixers, revolving truck mixers, continuous mixers
(Reference 1.5)


Sampling Fresh Concrete: The elapsed time between obtaining the first
and final portions of the composite sample shall not exceed
____________________. - ANSWER- 15 minutes (Reference 1.5)


Sampling Fresh Concrete: Portions of a composite sample shall be
thoroughly remixed before beginning tests on the sample? True or
False? - ANSWER- True (Reference 1.5.5)

,Sampling Fresh Concrete: Start tests for slump, temperature, and air
content within ________________ after obtaining the final portion of
the composite sample. - ANSWER- 5 minutes (Reference 1.5.5 &
Figure 1.6)


Sampling Fresh Concrete: Start molding specimens for strength tests
within ___________________ after fabricating the composite sample. -
ANSWER- 15 minutes (Reference 1.5.5 & Figure 1.6)


Sampling Fresh Concrete: The concrete sample must be protected from
contamination and ______________________. - ANSWER-
Evaporation (Reference 1.2)


Sampling Fresh Concrete: The minimum sample for making strength test
specimens is _____________________. - ANSWER- 1 FT^3 (28 L)
(Reference 1.5.1)


Sampling Fresh Concrete: Where sampling from a stationary mixer, the
batch must be sampled at ______ or more regularly spaced intervals
during discharge of the middle portion of the batch. - ANSWER- Two
(Reference 1.5.2)


Sampling Fresh Concrete: When sampling from a paving mixer, obtain
samples from a least ________ difference portions of the pile and
combine them into one composite sample for test purposes. -
ANSWER- Five (Reference 1.5.3)

, Sampling Fresh Concrete: When sampling from revolving truck mixer,
sample the concrete by collecting ________ or more portions taken at
regularly spaced intervals during discharge of the middle portion of the
batch. - ANSWER- Two (Reference 1.5.2)


Sampling Fresh Concrete: Concrete samples from a truck mixer must be
obtained before any water or admixtures are added to the mixer at the
job site. True or False? - ANSWER- False (Reference 1.5.2)


Sampling Fresh Concrete: When the concrete contains aggregate larger
than that permitted for a particular test method, the sample of concrete
must be ______________________ before making the test. - ANSWER-
Wet screened (Reference 1.5.1)


Temperature of Fresh Concrete: The stem of the thermometer is
submerged a minimum of _______________________. - ANSWER- 3
inches (75 mm) (Reference 2.4)


Temperature of Fresh Concrete: The thermometer shall be capable of
accurately measuring the temperature of freshly mixed concrete to
_____________________ throughout a range of
_________________________. - ANSWER- 1 degree F (+/- 0.5 degree
C), 30 to 120 degree F (0 to 50 degree C) (Reference 2.3.2)


Temperature of Fresh Concrete: The thermometer shall be verified
within
__________________________________________________________

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Anahsmith Walden University
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
18
Lid sinds
2 jaar
Aantal volgers
9
Documenten
1071
Laatst verkocht
1 maand geleden

3.8

4 beoordelingen

5
2
4
1
3
0
2
0
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen