Exam (elaborations)
CESSWI II Exam Questions and Answers 100% Solved
CESSWI II Exam Questions and Answers 
100% Solved 
What 5 things should one keep in mind when inspecting a fiber roll/wattle? 1. Inspect 
according to regulatory time tables 
2. Proper trenching beneath the fiber roll 
3. Sediment buildup behind the fiber rolls that is 1/3 to 1/2 of the visible roll height 
4. Splitting, tearing, unraveling, or slumping of wattle material
Exam (elaborations)
CESSWI Exam Flashcards Questions and Answers 100% Correct
PopularCESSWI Exam Flashcards Questions and 
Answers 100% Correct 
define slope slope/gradients is defined as a number, typically a %, that describes the 
direction and steepness of a surface 
typical method of slope calculation rise over run ( slope% = rise/run ) 
*to convert the decimal to a whole number, multiply the slope % by one hundred
Package deal
Cesswi Exam Pack With Complete Solutions
CESSWI II Exam Questions and Answers 100% Solved

2
Exam (elaborations)
CESSWI Part 2 Questions and Answers|Latest Update

3
Exam (elaborations)
CESSWI PART I Questions and Answers Graded A+

4
Exam (elaborations)
Cesswi 2 Questions and Answers 100% Solved

5
Exam (elaborations)
CESSWI- 8 (BMPs) Questions and Answers 100% Solved

6
Exam (elaboratio
Exam (elaborations)
CESSWI Study Modules Questions and Answers Graded A+
CESSWI Study Modules Questions and 
Answers Graded A+ 
The agencies will generally not assert jurisdiction over: 
- Swales or erosional features (such as gullies, small washes characterized by low volume, 
infrequent or short duration flow) 
- Ditches (including roadside ditches) excavated wholly in and draining only uplands and that do 
not carry a relatively permanent flow of water 
The agency will apply the significant nexus standard as follows:
Exam (elaborations)
CESSWI- Sections 1 + 2 Questions and Answers Verified by Experts
CESSWI- Sections 1 + 2 Questions and 
Answers Verified by Experts 
Two types of permits under NPDES: -general (CGP, IGP, multi-sector general permit for 
industrial activities) 
-individual 
What is a point source? Conveyance such as a pipe, ditch, channel, tunnel, conduit, 
discrete fissure or container, floating vessels, concentrated animal feeding operations 
Conditions all general permits share: -only stormwater may be discharged 
-discharge of stormwater containing hazardous materials mu...
Exam (elaborations)
CESSWI Questions with Complete Solutions
CESSWI Questions with Complete Solutions 
1977 Clean Water Act Amendments - emphasized need to control toxic pollutants 
- ensure Federal projects meet the same standards as non-Federal projects 
- help small communities meet the requirements of the CWA 
- encourage industry to experiment with water treatment 
- allow Federal and State governments to recover costs from oil and other hazardous substance 
spills 
1983 La Paz Agreement designed to protect the environment along the border region of...
Exam (elaborations)
CESSWI Questions and Answers 100% Solved
CESSWI Questions and Answers 100% 
Solved 
Section 404 regulates dredge / fill permitting into waters of the US administered by 
USACE 
CZARA Coastal Zone Act Reauthorization Amendments (CZARA) of 1990 requires 
coastal zone states to develop Coastal Nonpoint Pollution Control Programs
Exam (elaborations)
Cesswi Questions and Answers 100% Solved
Cesswi Questions and Answers 100% Solved 
Follow through with all ___________ even if invalid or beyond your control. Complaints 
The role of the inspector 1. "Official" representative on site 
2. The fact finder and record keeper 
3. The enforcement Case developer (legal issues) 
4. A technical instructor
Exam (elaborations)
CESSWI- 8 (BMPs) Questions and Answers 100% Solved
CESSWI- 8 (BMPs) Questions and Answers 
100% Solved 
Outlet Velocity Protection -designed to prevent scour at stormwater outlets and to 
minimize the potential for downstream erosion through velocity dissipation 
Pipe Slope Drain -uses piping materials to convey flow down a slope without causing 
erosion damage to the slope
Exam (elaborations)
Cesswi 2 Questions and Answers 100% Solved
Cesswi 2 Questions and Answers 100% 
Solved 
Sediment basin structural BMP that allows stormwater runoff to be collected and sediment 
to fall out of suspension before water is allowed to undergo controlled release. Larger drainage 
area 
sediment trap structural BMP that provides and area for sediment laden runoff to pond, 
allowing the sediment to settle out of suspension before runoff is discharged. Smaller drainage 
area
Exam (elaborations)
CESSWI PART I Questions and Answers Graded A+
CESSWI PART I Questions and Answers 
Graded A+ 
Types of Permitting Authority • NPDES states with general permitting authority 
• NPDES states with individual permitting 
authority 
• NPDES states with both general and individual 
permitting authority 
State-Specific Requirements • The states that have NPDES authority include their statespecific 
requirements in the general permits. 
• Individual permits can also contain state requirements within the 
individual (site-specific) permi...
Exam (elaborations)
CESSWI Part 2 Questions and Answers|Latest Update
CESSWI Part 2 Questions and 
Answers|Latest Update 
RCP: descript and purp temp or perm erosion control blankets that act as soils 
stabilization devices to protect diet areas from erosions. 
RCP: object 1) erosion control 
2) runoff control 
3) post construct 
RCP: target pollutants 1) sediment