100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Cesswi 2 Questions and Answers 100% Solved

Puntuación
-
Vendido
-
Páginas
16
Grado
A+
Subido en
26-03-2025
Escrito en
2024/2025

Cesswi 2 Questions and Answers 100% Solved Sediment basin structural BMP that allows stormwater runoff to be collected and sediment to fall out of suspension before water is allowed to undergo controlled release. Larger drainage area sediment trap structural BMP that provides and area for sediment laden runoff to pond, allowing the sediment to settle out of suspension before runoff is discharged. Smaller drainage area

Mostrar más Leer menos
Institución
CESSWI....
Grado
CESSWI....

Vista previa del contenido

Cesswi 2 Questions and Answers 100%
Solved

Sediment basin structural BMP that allows stormwater runoff to be collected and sediment

to fall out of suspension before water is allowed to undergo controlled release. Larger drainage

area




sediment trap structural BMP that provides and area for sediment laden runoff to pond,

allowing the sediment to settle out of suspension before runoff is discharged. Smaller drainage

area




Stabilized construction entrance/exit reduces the tracking of sediment onto public rights of

way. 50 ft long, 10 ft wide, 6-12in deep




temporary stream crossing comprised of a culvert, ford, or bridge that spans waterway to

provide construction traffic a safe and stable access point. Not to exceed a year of use




Diversions temporary or permanent BMPs that intercept and divert runoff to a stabilized

outlet or treatment facility. Can be vegetated , hardened with rock or concrete, or covered with

rolled E&S products

,Inlet protection at grade ex. drop inlet; BMPs that are flush to the ground. Is considered a

secondary control device




Inlet protection -block and gravel temporary BMP that promotes the settling of sediment

by pooling water. Considered a secondary control device




wet ponds are designed to remove pollutants from... post-construction runoff by way of a

permanent pool. During construction they are used for sediment removal during phases. Treat

large drainage areas




Secondary containment facilities should be regularly drained and disposed of properly so that

their capacity at any point in time is equal to 110% of the primary storage containers




permeable surfaces BMPs made of porous bituminous asphalt, porous concrete,

interlocking concrete paving blocks or grid pavers, reinforced turf, plastic grids, bricks, or grass.

The make ground surface more rigid and will allow for infiltration. provide water quality and

groundwater recharge benefits.

, permeable pavement does not work well in ______ soils Clay (D soils)




infiltration basins/ponds consists of a shallow impoundment, which is designed to

infiltrate stormwater into soil. Increases baseflow of streams due to ground water recharging




infiltration trench BMP that is a rock filled trench with no outlet that receives stormwater

runoff. Stormwater is passed through a combination of pretreatment measures (swale, basin) then

into trench where it is stored in a void space and then infiltrates into soil.




infiltration trenches treat small sites less than 5 acres




bioretention features plants, specialized soils and mulches to provide onsite treatment of

stormwater runoff. They collect surface runoff and serve as water quality and quantity BMP




sand and organic filters 2 celled or chambered BMP; 1st cell settles large pollutants, 2nd

cell acts as filtering device (sand). Treat up to 10 Acres. Does not discharge to groundwater

system or soils.

Escuela, estudio y materia

Institución
CESSWI....
Grado
CESSWI....

Información del documento

Subido en
26 de marzo de 2025
Número de páginas
16
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$14.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
ARVEX

Documento también disponible en un lote

Thumbnail
Package deal
CESSWI EXAM PACK WITH COMPLETE SOLUTIONS
-
11 2025
$ 170.89 Más información

Conoce al vendedor

Seller avatar
ARVEX stuvia
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
7
Miembro desde
10 meses
Número de seguidores
0
Documentos
2867
Última venta
2 meses hace

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes