PJM
PJM
Aquí están los mejores recursos para pasar PJM. Encuentra PJM guías de estudio, notas, tareas, y mucho más.
Página 3 fuera de 285 resultados
Ordenador por:
-
Examen
PJM Practice Exam Questions And Answers |Latest 2025 | Guaranteed Pass.
-
---34marzo 20252024/2025A+
- ©THESTAR 2025 ALL RIGHTS RESERVED 11:41 AM A+ 
1 | P a g e 
PJM Practice Exam Questions And Answers 
|Latest 2025 | Guaranteed Pass. 
A Heavy Load Voltage Schedule Warning is typically issued ___ prior to actual implementation. - 
Answerc. 4 hours 
The following would be considered non-critical plant load (Select 2) - AnswerA. Office Area Air 
Conditioners 
C. Lighting 
During a Cold Weather Alert, PJM will take which of the actions - AnswerD. Assume an 
unavailability rate for schedule generat...
-
$12.99 Más información
TheStar
-
Examen
Generator operational requirements: PJM Manual 14 UPDATED ACTUAL Exam Questions and CORRECT Answers
-
--9septiembre 20252025/2026A+Disponible en un paquete
- Generator operational requirements: PJM 
Manual 14 UPDATED ACTUAL Exam 
Questions and CORRECT Answers 
True or false? The interconnection coordination project manager coordinates the activities of 
PJM internal coordination and the generation owner to complete the generator markets and 
operations activities - CORRECT ANSWER 
True 
True or false? In the event that a local geography name has already been used in another part of 
PJM, a local landmark will be identified and used for t...
-
$12.49 Más información
MGRADES
-
Examen
PJM Exam Questions And Answers |Latest 2025 | Guaranteed Pass
-
---22marzo 20252024/2025A+
- ©THESTAR 2025 ALL RIGHTS RESERVED 11:41 AM A+ 
1 | P a g e 
PJM Exam Questions And Answers |Latest 
2025 | Guaranteed Pass. 
What is the threshold for having a satellite phone? - Answer500 MW 
How often is reactive testing completed? - Answer5 years 
Which of the following would NOT be a cause for a sudden deviation in the balancing area ACE? 
1) Incorrect interchange number 
2) Loss of a tie-line RTU 
3) Loss of internal load 
4) Loss of adjacent control area generation - AnswerLoss of adjacen...
-
$12.99 Más información
TheStar
-
Examen
PJM Generation Operation Exam UPDATED ACTUAL Exam Questions and CORRECT Answers
-
--8septiembre 20252025/2026A+Disponible en un paquete
- PJM Generation Operation Exam 
UPDATED ACTUAL Exam Questions and 
CORRECT Answers 
Control center facilities must have a minimum of how many days of fuel for the backup 
generator? - CORRECT ANSWER 
5 days 
If PJM ACE shows overgeneration, actual imports are: - CORRECT ANSWER 
scheduled 
Who should a generator contact at PJM to clear an outage ticket? - CORRECT 
ANSWER 
Master Coordinato
-
$12.49 Más información
MGRADES
-
Examen
PJM Test Exam Questions And Answers |Latest 2025 | Guaranteed Pass.
-
---53marzo 20252024/2025A+
- ©THESTAR 2025 ALL RIGHTS RESERVED 11:41 AM A+ 
1 | P a g e 
PJM Test Exam Questions And Answers 
|Latest 2025 | Guaranteed Pass. 
Which of the following balancing control modes is used by PJM under normal operations? - 
AnswerTie-Line Bias 
Which of the following influences does PJM consider when performing their system load 
forecast? - AnswerWeather Conditions & Day of the Week 
All of the following are limits that must be submitted to PJM for generating units EXCEPT: 
1. Eco Min 
2. Eco Max ...
-
$14.99 Más información
TheStar
-
Examen
PJM Review UPDATED ACTUAL Exam Questions and CORRECT Answers
-
--8septiembre 20252025/2026A+Disponible en un paquete
- PJM Review UPDATED ACTUAL Exam 
Questions and CORRECT Answers 
There are only two categories of reserves that are essential and therefore need to be tracked 
during system restoration. - CORRECT ANSWER 
Dynamic Reserve and Synchronous 
Reserve 
This _______________ Reserve may be either on-line generation that can be loaded within 10 
minutes or load that can be shed manually within 10 minutes. - CORRECT 
ANSWER 
Synchronous Reserve
-
$12.49 Más información
MGRADES