100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

PJM GENERATION CERT QUESTIONS & ANSWERS

Puntuación
-
Vendido
-
Páginas
16
Grado
A+
Subido en
24-06-2025
Escrito en
2024/2025

PJM GENERATION CERT QUESTIONS & ANSWERS

Institución
PJM
Grado
PJM










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
PJM
Grado
PJM

Información del documento

Subido en
24 de junio de 2025
Número de páginas
16
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

PJM GENERATION CERT QUESTIONS & ANSWERS
Actions in low voltage alert? - Answers -Review transmission & generation outages
Request reactive reserve check

Heavy load voltage schedule warning purpose is to have members prepare far max
support of voltages on the? - Answers -Bulk Power System

Manual load dump warning & reduction of Non-critical plant load issued when? -
Answers -Primary reserve is less the the largest generating unit.
Loss of transmission facility jeopardize reliability after all possible measures have been
taken to increase reserves

Hot weather alert - Answers -COMED 90
DOM & EKPC 95

PJM issues high system voltage message - Answers -Gen operators should operate
the lower end of their voltage bandwidth

Primary reserve warning - Answers -Ensure deffer able Maintenance is halted

General actions PJM takes when conservating ops initiated? - Answers -
Purchase/load additional reserves
begin studying double contingencies
Lower IROL
Increase # of SOS calls

Purpose of heavy voltage schedule action is to increase reactive reserves - Answers -
EHV system

National terrorism advisory system 2 types of alerts? - Answers -Elevated threat
Imminent threat

Non-critical plant load - Answers -lighting, office area a/c

Purpose of capacity emergency warning? - Answers -keep members informed of
actual capacity shortages or contingencies that may jeopardize reliability during RT ops

keep all affected system personnel aware of the forecast and actual status of the PJM
RTO

Heavy load voltage schedule action - Answers -Gen operators- maintain MVAR
reserve on units connected to EHV

During cold weather action - Answers -Assume an unavailability rate for scheduled
generation

,During terrorism/sabotage emphasis on? - Answers -Operations & communications

For voltage support TOs can request? - Answers -Generators stay online

During Restoration what is removed from service until sufficient load restored to
maintain voltage - Answers -Shunt capacitors

Freq change=(load change/connected capacity)X Gov droop in percentage - Answers -

LMP calculated day ahead market - Answers -Every hour
RT every 5mins

Penalty factor - - Answers -incremental loss for a bus used to include the effect of
losses on the dispatch

All call types - Answers -Operational, Emergency Messages, Informational

Voltage reduction Alert- - Answers -Est. operating reserve capacity is less than
forecasted synchronized reserve equipment

Generation owners - Answers -Must handle environmental Alerts

Emergency requires action to? - Answers -Maintain freq prevent load loss, ensure
safety and reliability

Alerts - Answers -Advance of operating day

Warning & actions - Answers -During that day

Emergency situation - Answers -Implement procedures within 30min

STE- Short term emergency rating - Answers -

Low voltage alerts - Answers -Analyze reactive capabilities
Reactive reserve check

Heavy load voltage schedule warning - Answers -4 hrs prior

Heavy load voltage schedule action - Answers -500kv (UHV system) support- EHV
Place caps online
Reactors removed
AVR online

High system voltage - Answers -caps out/reactors in

, Manual load dump&reduction of non-critical load - Answers -issued when available
primary reserve capacity less than largest Gen or Trans

For voltage support PJM can request generator adjustments - Answers -Direct
adversely affect MW%
Generator to come online for voltage support
Remain online when scheduled to come offline

Unit startup notification Alert - Answers -Place Gen units ready to be started in 48hrs

Voltage reduction - Answers -2.5%-5%

Min Gen Alert implemented when - Answers -The expected gen level is within 2500mw
of normal min energy limits include
Adjusted min generation, valley & load est, margin values

Min Gen Value - Answers -Economic Min- Emergency Min= ERG
ERG- emergency reducible generation

Temperature for cold weather Alert - Answers -10 degress

During suspected terrorism - Answers -emphasis on operation and communication

NOAA issues alert at - Answers -K-5 or higher

Voltage reduction Warning - Answers -Available synchronized reserves is less than
synchronized reserve requirement

Contact who for suspected terrorism - Answers -PJM shift supervisor

Cold weather alert - Answers -PJM assumes certain unavailability rates for generation
amount

Regulation - Answers -Energy under automatic control that can respond within 5 Min
and to freq changes
Correct for small load changes

Synchronized reserves - Answers -generators respond within 10 min
increase output from generator
reduction in load from a resource
max output energy of synchronous condensor

Operating Reserves - Answers -Primary reserve T< or = 10min
Synchronized & quick start reserve
Supplemental reserve 10<T< or = 30min
$14.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GEEKA YALA UNIVERSITY
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2009
Miembro desde
3 año
Número de seguidores
1447
Documentos
48320
Última venta
1 día hace

3.8

345 reseñas

5
172
4
61
3
44
2
16
1
52

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes