©THESTAR 2025 ALL RIGHTS RESERVED 11:41 AM A+ 1 | P a g e PJM Test Exam Questions And Answers |Latest 2025 | Guaranteed Pass. Which of the following balancing control modes is used by PJM under normal operations? - AnswerTie-Line Bias Which of the following influences does PJM consider when performing their system load forecast? - AnswerWeather Conditions & Day of the Week All of the following are limits that must be submitted to PJM for generating units EXCEPT: 1. Eco Min 2. Eco Max 3. Emergency Max 4. Dynamic Instability - AnswerDynamic Instability ©THESTAR 2025 ALL RIGHTS RESERVED 11:41 AM A+ 2 | P a g e If PJM experienced an event that caused the loss of a 1,000 MW generator, which of the following would most likely provide the quickest impact to improve the undegenerating Area Control Area (ACE)? 1. Remedial Action Reserve 2. Synch Reserve 3. Non-Synch Reserve 4. Secondary Reserve - AnswerSynch Reserve Your system has experienced an event that caused the frequency to drop below 60.00 Hz, what would be the most likely event that occurred? - AnswerA generator on your system tripped offline How does the PJM dispatcher inform the Members of the PJM regulation Requirements? - AnswerAll-Call In order for your generator to quality to supply regulation in the PJM Regulation market, it must be able to respond and attain its desired output within how many minutes? - Answer5 minutes ©THESTAR 2025 ALL RIGHTS RESERVED 11:41 AM A+ 3 | P a g e Based on a generator capability curve, in order to maximize the MVAR output of the generator, it may be necessary to: - Answerdecrease the MW output of the unit PJM maintains a regulation quality standard which states that a generator may be certified to provide regulation only after it achieves three consecutive regulation test scores of at least - Answer75% Which of the following would NOT be a cause for a sudden deviation in the balancing area ACE? 1. incorrect interchange number 2. loss of a tie-line RTU 3. loss of internal load 4. loss of adjacent control area generation - Answerloss of adjacent control area generation The primary purpose for the balancing area to have Regulation is to correct for: - Answersmall deviations in load It is necessary for Generation Owner dispatchers to notify PJM of unplanned unit outages: - Answeras soon as practicable ©THESTAR 2025 ALL RIGHTS RESERVED 11:41 AM A+ 4 | P a g e PJM should be made aware of any fuel shortage that a generator may experience. This information assists in analyzing the resources and reliably operating the system. A heightened awareness is expected during: - Answerextreme hot or cold conditions Generators are required to obtain PJM approval prior to removing a generating unit from service. The only exception is for: - Answerinjury to personnel will be prevented Prior to removing a self-scheduled generator from service, the PJM member must first - Answergive PJM the option to takeover the unit for the market When PJM experiences problems with their primary digital control signal, it sometimes becomes necessary for companies with the capability, to switch to the back-up signal. This backup signal is known as: - AnswerAnalog control When PJM sends cost signals to generators, to provide direction for increasing or decreasing the facility output, this signal that is sent is known as: - AnswerDispatch Rate

Mostrar más Leer menos
Institución
PJM
Grado
PJM











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
PJM
Grado
PJM

Información del documento

Subido en
23 de marzo de 2025
Número de páginas
53
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

©THESTAR 2025 ALL RIGHTS RESERVED 11:41 AM A+




PJM Test Exam Questions And Answers
|Latest 2025 | Guaranteed Pass.




Which of the following balancing control modes is used by PJM under normal operations? -

Answer✔Tie-Line Bias




Which of the following influences does PJM consider when performing their system load

forecast? - Answer✔Weather Conditions & Day of the Week




All of the following are limits that must be submitted to PJM for generating units EXCEPT:




1. Eco Min

2. Eco Max

3. Emergency Max

4. Dynamic Instability - Answer✔Dynamic Instability




1|Page

, ©THESTAR 2025 ALL RIGHTS RESERVED 11:41 AM A+


If PJM experienced an event that caused the loss of a 1,000 MW generator, which of the

following would most likely provide the quickest impact to improve the undegenerating Area

Control Area (ACE)?




1. Remedial Action Reserve

2. Synch Reserve

3. Non-Synch Reserve

4. Secondary Reserve - Answer✔Synch Reserve




Your system has experienced an event that caused the frequency to drop below 60.00 Hz, what

would be the most likely event that occurred? - Answer✔A generator on your system tripped

offline




How does the PJM dispatcher inform the Members of the PJM regulation Requirements? -

Answer✔All-Call




In order for your generator to quality to supply regulation in the PJM Regulation market, it must

be able to respond and attain its desired output within how many minutes? - Answer✔5

minutes




2|Page

, ©THESTAR 2025 ALL RIGHTS RESERVED 11:41 AM A+


Based on a generator capability curve, in order to maximize the MVAR output of the generator,

it may be necessary to: - Answer✔decrease the MW output of the unit




PJM maintains a regulation quality standard which states that a generator may be certified to

provide regulation only after it achieves three consecutive regulation test scores of at least -

Answer✔75%




Which of the following would NOT be a cause for a sudden deviation in the balancing area ACE?




1. incorrect interchange number

2. loss of a tie-line RTU

3. loss of internal load

4. loss of adjacent control area generation - Answer✔loss of adjacent control area generation




The primary purpose for the balancing area to have Regulation is to correct for: - Answer✔small

deviations in load




It is necessary for Generation Owner dispatchers to notify PJM of unplanned unit outages: -

Answer✔as soon as practicable




3|Page

, ©THESTAR 2025 ALL RIGHTS RESERVED 11:41 AM A+


PJM should be made aware of any fuel shortage that a generator may experience.




This information assists in analyzing the resources and reliably operating the system. A

heightened awareness is expected during: - Answer✔extreme hot or cold conditions




Generators are required to obtain PJM approval prior to removing a generating unit from

service.




The only exception is for: - Answer✔injury to personnel will be prevented




Prior to removing a self-scheduled generator from service, the PJM member must first -

Answer✔give PJM the option to takeover the unit for the market




When PJM experiences problems with their primary digital control signal, it sometimes

becomes necessary for companies with the capability, to switch to the back-up signal.




This backup signal is known as: - Answer✔Analog control




When PJM sends cost signals to generators, to provide direction for increasing or decreasing

the facility output, this signal that is sent is known as: - Answer✔Dispatch Rate

4|Page
$14.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TheStar Florida State University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
611
Miembro desde
2 año
Número de seguidores
179
Documentos
24244
Última venta
2 días hace
Stuvia Prodigy

Tested, Verified and Updated Study Materials with 100% Guaranteed Success.

3.8

122 reseñas

5
58
4
22
3
21
2
4
1
17

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes