PJM Practice Questions And Answers
Latest Update
Save
Practice questions for this set
Learn 1 /7 Study with Learn
Electronic security perimeter
Choose matching term
The following would be considered non-critical plant load
1
(Select 2)
The logical border surrounding a network that BES cyber assets
2
are connected to is the
, With the exception of intermittent resources, Over-excited
3 (Lagging) test results are the values of MVAR output that can be
sustained for how long?
Which of the following statements about the "Top Down"
restoration method are correct?
1 - It allows for the restoration of several areas of the system at
the same time
4
2 - You are reliant on your neighbor's ability to supply power
3 - It will require multiple points of synchronization
4 - Your system should be stable since it will be connected to
the Eastern Interconnection
Don't know?
Terms in this set (169)
A Heavy Load c. 4 hours
Voltage Schedule
Warning is
typically issued ___
prior to actual
implementation.
The following A. Office Area Air Conditioners
would be C. Lighting
considered non-
critical plant load
(Select 2)
,During a Cold D. Assume an unavailability rate for
Weather Alert, PJM schedule generation
will take which of
the actions
When PJM issues a B. The lower end of their voltage
High System bandwidth
Voltage Message,
the GO should
have its units
operate at:
What would the C. 50 MW
reportable
Emergency
Reducible
Generation be if
the Generator
Output is 400 MW,
Economic Min is
225 MW and the
Emergency Min is
175 MW
PJM can issue the D. The entire RTO, specific Control
Deploy All Zones, or a subset of a Control Zone if
Resources Action transmission limitations exist
for
, PJM has issued a B. 25MW
Minimum
Generation Alert.
Your current
generation is 200
MW. The Economic
Minimum is 150
MW and the
Emergency Min is
125 MW. How
much ERG should
be reported for
this unit?
Which of the A. Perform job studies looking at the
following steps loss of multiple pieces of equipment as
would PJM take as a single event
part of initiating
Conservative C. Initiate additional off-cost operation
Operations? to limit or reduce flows across critical
(Select 2) interfaces
The purpose of the D. Immediately upon receipt of dispatch
Deploy All instructions
Resources Action
is to instruct all
generating
resources to be on
line and at full
output ____
Latest Update
Save
Practice questions for this set
Learn 1 /7 Study with Learn
Electronic security perimeter
Choose matching term
The following would be considered non-critical plant load
1
(Select 2)
The logical border surrounding a network that BES cyber assets
2
are connected to is the
, With the exception of intermittent resources, Over-excited
3 (Lagging) test results are the values of MVAR output that can be
sustained for how long?
Which of the following statements about the "Top Down"
restoration method are correct?
1 - It allows for the restoration of several areas of the system at
the same time
4
2 - You are reliant on your neighbor's ability to supply power
3 - It will require multiple points of synchronization
4 - Your system should be stable since it will be connected to
the Eastern Interconnection
Don't know?
Terms in this set (169)
A Heavy Load c. 4 hours
Voltage Schedule
Warning is
typically issued ___
prior to actual
implementation.
The following A. Office Area Air Conditioners
would be C. Lighting
considered non-
critical plant load
(Select 2)
,During a Cold D. Assume an unavailability rate for
Weather Alert, PJM schedule generation
will take which of
the actions
When PJM issues a B. The lower end of their voltage
High System bandwidth
Voltage Message,
the GO should
have its units
operate at:
What would the C. 50 MW
reportable
Emergency
Reducible
Generation be if
the Generator
Output is 400 MW,
Economic Min is
225 MW and the
Emergency Min is
175 MW
PJM can issue the D. The entire RTO, specific Control
Deploy All Zones, or a subset of a Control Zone if
Resources Action transmission limitations exist
for
, PJM has issued a B. 25MW
Minimum
Generation Alert.
Your current
generation is 200
MW. The Economic
Minimum is 150
MW and the
Emergency Min is
125 MW. How
much ERG should
be reported for
this unit?
Which of the A. Perform job studies looking at the
following steps loss of multiple pieces of equipment as
would PJM take as a single event
part of initiating
Conservative C. Initiate additional off-cost operation
Operations? to limit or reduce flows across critical
(Select 2) interfaces
The purpose of the D. Immediately upon receipt of dispatch
Deploy All instructions
Resources Action
is to instruct all
generating
resources to be on
line and at full
output ____