PJM

PJM

Here are the best resources to pass PJM. Find PJM study guides, notes, assignments, and much more.

Page 2 out of 72 results

Sort by

PJM Test Prep | 200 Questions with 100% Correct Answers | Verified | Latest Update 2024
  • PJM Test Prep | 200 Questions with 100% Correct Answers | Verified | Latest Update 2024

  • Exam (elaborations) • 20 pages • 2024
  • PJM Test Prep | 200 Questions with 100% Correct Answers | Verified | Latest Update 2024 WHEN A BA IS UNDERGENERATING, IT MEANS? - Correct Answer TOTAL GENERATION < THE TOTAL LOAD REACTIVE RESERVE CHECK PROVIDES A SNAPSHOT OF RESERVES ON THE SYSTEM. WHAT ARE THE 3 TYPES OF RESERVES? - Correct Answer 1. UNIT MVAR RESERVE = TOTAL LAGGING RESERVE OF ALL SYNCED UNITS 2. SVC'S TOTAL LAGGING RESERVE 3. CAPACTIORS OUT OF SVC, REACTORS IN SVC COUNTS EACH IROL'S Tv SHALL BE LESS THAN OR...
    (0)
  • $11.99
  • + learn more
 PJM Generation Dispatcher Exam  2024 with 100% correct answers
  • PJM Generation Dispatcher Exam 2024 with 100% correct answers

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • An EXCITER on a traditional generator does what? - correct answer Voltage regulation (AVR) if you change the excitation current, you change the voltage. ECO Min, ECO Max, and EMERG Max are genrator _________________. - correct answer Limits When synchronizing to the interconnection, what needs to be synchronized? - correct answer Frequency, Voltage, and phase angle. GMD (GeoMagnetic Disturbance) procedure is implemented when? - correct answer 10A or greater is measured by specia...
    (0)
  • $16.49
  • + learn more
PJM Sample Test Review 150 Questions with 100% Verified Correct Answers
  • PJM Sample Test Review 150 Questions with 100% Verified Correct Answers

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • PJM Sample Test Review 150 Questions with 100% Verified Correct Answers Real time transmission constraints or contingencies may be alleviated with generators operating ______________ - Correct Answer off cost out of merit. Monitoring ___________ may give insights into system constraints. - Correct Answer Monitoring LMP's PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. - Correct Answer PJM calls on synchronized reserves If not cancelled by...
    (0)
  • $11.99
  • + learn more
PJM Sample Test Review | 150 Questions with 100% Correct Answers | Verified | Latest Update 2024
  • PJM Sample Test Review | 150 Questions with 100% Correct Answers | Verified | Latest Update 2024

  • Exam (elaborations) • 15 pages • 2023
  • Available in package deal
  • Real time transmission constraints or contingencies may be alleviated with generators operating ______________ - off cost out of merit. Monitoring ___________ may give insights into system constraints. - Monitoring LMP's PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. - PJM calls on synchronized reserves If not cancelled by PJM, the minimum generation alert expires at the end of the specified ______________. - light load period When PJM decl...
    (0)
  • $10.49
  • + learn more
PJM Test Questions and Answers 2023-2024 with complete solution
  • PJM Test Questions and Answers 2023-2024 with complete solution

  • Exam (elaborations) • 24 pages • 2023
  • PJM Test Questions and Answers 2023-2024 with complete solution
    (0)
  • $14.99
  • + learn more
PJM Sample TO Exam Questions & Answers 2024
  • PJM Sample TO Exam Questions & Answers 2024

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • PJM Sample TO Exam Questions & Answers 2024 What is the minimum notice PJM requires for a nonemergency transmission outage work request which does not cause congestion? A. 48 hours B. First day of month proceeding the month of the outage C. 5 working days D. 1 week - ANSWER-B. First day of month proceeding the month of the outage A system load is 3000MW. To increase frequency by 1 Hz, how much load should be she? A. 80MW B. 180MW C. 350MW D. 500MW - ANSWER-B. 180MW When thunde...
    (0)
  • $8.99
  • + learn more
PJM Test Questions & Correct Answers | Latest  Update |Already Graded A+
  • PJM Test Questions & Correct Answers | Latest Update |Already Graded A+

  • Exam (elaborations) • 52 pages • 2024
  • Which of the following balancing control modes is used by PJM under normal operations? : Tie-Line Bias Which of the following influences does PJM consider when performing their system load forecast? : Weather Conditions & Day of the Week All of the following are limits that must be submitted to PJM for generating units EXCEPT: 1. Eco Min 2. Eco Max 3. Emergency Max 4. Dynamic Instability : Dynamic Instability If PJM experienced an event that caused the loss of a 1,000 MW generato...
    (0)
  • $13.49
  • + learn more
PJM Test Exam | Questions & 100% Correct  Answers (Verified) | Latest Update | Grade A+
  • PJM Test Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+

  • Exam (elaborations) • 56 pages • 2024
  • Available in package deal
  • Which of the following balancing control modes is used by PJM under normal operations? : Tie-Line Bias Which of the following influences does PJM consider when performing their system load forecast? : Weather Conditions & Day of the Week All of the following are limits that must be submitted to PJM for generating units EXCEPT: 1. Eco Min 2. Eco Max 3. Emergency Max 4. Dynamic Instability : Dynamic Instability 2 | P a g e If PJM experienced an event that caused the loss of a 1,00...
    (0)
  • $13.49
  • + learn more
PJM Questions & Correct Answers | Latest  Update |Already Graded A+
  • PJM Questions & Correct Answers | Latest Update |Already Graded A+

  • Exam (elaborations) • 47 pages • 2024
  • During System Restoration, what is the optimal Frequency Range? : 59.75 - 61 Hz The 500 kV system has normal bus voltages between? : 500 to 550 kV When Connecting 2 islands, the operator must match? : Voltage, Phase Angle and Frequency What are the Minimum Source Requirements-(500kV+) for a 500 kV? : 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV When will PJM issue a Minimum Generation Alert? : When expected generation levels fall within 2500 MW of normal op...
    (0)
  • $13.49
  • + learn more
PJM Sample Test Review Exam | Questions &  100% Correct Answers (Verified) | Latest  Update | Grade A
  • PJM Sample Test Review Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A

  • Exam (elaborations) • 31 pages • 2024
  • Available in package deal
  • Real time transmission constraints or contingencies may be alleviated with generators operating ______________ : off cost out of merit. Monitoring ___________ may give insights into system constraints. : Monitoring LMP's PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. : PJM calls on synchronized reserves If not cancelled by PJM, the minimum generation alert expires at the end of the specified ______________. : light load period 2 | P ...
    (0)
  • $12.39
  • + learn more