- Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about ? On this page you'll find 1 study documents about .
All 1 results
Sort by
-
LARE - Section 1 – Terms Verified A+
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $9.69
- + learn more
LARE - Section 1 – Terms Verified A+ 
ACCELERATION COST ️️cost incurred by a contractor when the project is interfered with by the 
owner, in such a way, that the contractor must employ more manpower or work more hours in order to 
complete the project on time. If the contractor contributes to the cause of its own delays, acceleration 
cost may not be granted. 
What is the role of vegetation in reducing soil erosion in landscape design? 
Vegetation helps stabilize the soil by bindi...
How much did you already spend on Stuvia? Imagine there are plenty more of you out there paying for study notes, but this time YOU are the seller. Ka-ching! Discover all about earning on Stuvia