Exam (elaborations)
ACQ Exam 1 | 88 Questions with 100% Correct Answers | Verified | Latest Update 2024
What is the last activity in the Life Cylcle process - Disposal 
What are the responsibilities of the DACM - 1. Establish and monitor training requirements and 
DAWIA compliance 2. Certifies Dawia standards have been met 
What are the 3 Risk factors - Cost, Performance, Schedule 
What is required for an Acquisition - An Approved need 
Systems Engineering is responsible for - integration throughout the entire life cycle 
What is the GOV role in systems engineering - manage the total program 
meet...
Exam (elaborations)
ACQ 101 Module 15 Software Acquisition Questions and Answers
ACQ 101 Module 15 Software Acquisition Questions and Answers 
 
What is considered to be the computer's brain? CPU 
 
Which of these are categories of software? application software; operating systems; programming languages 
 
What is an example of a computer input device? mouse 
 
The multiple launch rocket system and mission data planning system for cruise missiles are weapons systems with embedded software? true 
 
Weapons systems with embedded software performs random administrative functio...
Exam (elaborations)
Acq 120 Module 7 Exam 2024
ACQ 120 MODULE 7 EXAM 2024 
 
Which of the following best defines the purposes of IEP annexes? Establish defined information exchange relationships in specific RDT&E areas. 
 
Which of the following describes military or civilian officials assigned to an international program office for a cooperative program to perform managerial, technical, logistics, financial or other functions in support of all participants? Cooperative Program or Project Personnel (CPP) 
 
Which program encourages DoD compo...
Exam (elaborations)
Acq 120 Module 8 Exam 2024
ACQ 120 MODULE 8 EXAM 2024 
 
Which of the following describes the provision of AECA Section 27 that allows the United States to contract on behalf of another country for an 
International Cooperative Program without having all of their funding in advance of the contractual obligation? Dependable undertaking. 
 
Which of the following is not authorized by 10 U.S.C. 2350a "Cooperative Research and Development Agreements"? Using this legal authority for International Cooperative Programs that ...
Exam (elaborations)
ACQ Exam 1 | 88 Questions with 100% Correct Answers | Verified | Latest Update 2024
What is the last activity in the Life Cylcle process - Disposal 
What are the responsibilities of the DACM - 1. Establish and monitor training requirements and 
DAWIA compliance 2. Certifies Dawia standards have been met 
What are the 3 Risk factors - Cost, Performance, Schedule 
What is required for an Acquisition - An Approved need 
Systems Engineering is responsible for - integration throughout the entire life cycle 
What is the GOV role in systems engineering - manage the total program 
meet...
Exam (elaborations)
ACQ 0030 2023/2024 Question and answers correctly solved
ACQ /2024 Question and answers correctly solved 
You just witness a scenario which calls for Gloria, a Government employee, to make a decision regarding tickets to a game offered by Cliff, a contractor employee. If you were Gloria, what would you do? - correct answer Politely decline the tickets and do not go to the game because some may think there is "shady" business going on. 
 
You just witness a scenario which calls for Gloria, a Government employee, to make a decision regarding how to c...
Exam (elaborations)
ACQ 0030 Question and answers correctly solved 2023/2024
ACQ 0030 Question and answers correctly solved 2023/2024A retired Colonel in the Army has been hired by ACME Corporation, Aviation Weapons Division, 
To be an expert consultant for all new weapons procurement activity. Fourteen months prior to his last official role in the Army, the Colonel was the Chief Contracting Officer for all new weapons procurement activity. You are the Program Manager for the Government on an upcoming new weapons procurement project. You should: - correct answer Be aware...
Exam (elaborations)
ACQ 101 - Mod 1 Question and answers 2023/2024 verified to pass
ACQ 101 - Mod 1 Question and answers 2023/2024 verified to passWhich of the following are considered primary objectives of System Acquisition Management? (Select all that apply) - correct answer o Satisfy the needs of operational users 
o Provide measurable improvements in functional capabilities 
o Acquire products in a timely manner at a fair and reasonable cost 
 
Which of the following best describes a system? - correct answer Hardware, software, logistics support, and personnel 
 
An exampl...
Exam (elaborations)
ACQ 101 - Mod 2 Question and answers already passed 2023/2024
ACQ 101 - Mod 2 Question and answers already passed 2023/2024Representing constituent interests, setting resource ceilings, and balancing national security and social needs are characteristics of which institution? - correct answer Congress 
 
Formulating national security policy, negotiating with Congress, and maintaining a balanced force structure are characteristics of which institution? - correct answer Executive Branch 
 
Considering stockholders' interests, responding to solicitations, an...
Exam (elaborations)
ACQ 101 1 Question and answers 100% correct 2023/2024
ACQ 101 1 Question and answers 100% correct 2023/2024APB - correct answer Acquisition Program Baseline 
 
CDD - correct answer Capability Development Document 
 
CLIN - correct answer Contract Line Item Number 
 
ECP - correct answer Engineering Change Proposal 
 
HEMP - correct answer High-Altitude Electromagnetic Pulse 
 
NTE - correct answer not to exceed 
 
PMR - correct answer Program Management Review 
 
PRM - correct answer Production Representative Model 
 
STR - correct answer Software...
Exam (elaborations)
ACQ 101 EXAM 2 Question and answers already passed 2023/2024
ACQ 101 EXAM 2 Question and answers already passed 2023/2024 Acquisitions Plans Policy - correct answer Agencies shall perform acquisition planning and conduct market research for all acquisitions in order to promote and provide for: 
 
Acquisition of commercial or non nondevelopment items 
Full and open competition 
Selection of appropriate contract type 
Appropriate consideration of the use of pre-existing contracts 
 
When does Acquisition Planning begin? - correct answer Should begin as soo...
Exam (elaborations)
ACQ 101 July 2016(UPDATED) Question and answers 100% correct
ACQ 101 July 2016(UPDATED) Question and answers 100% correct 
Why did Congress passed the Defense Acquisition Workforce Improvement Act (DAWIA)? - correct answer Because defense systems are - Complex, Costly, and Require qualified personnel 
 
Within the DAWIA framework, there is a Functional Advisor (FA) for each functional area who, along with an Integrated Product Team (IPT). What is their job? - correct answer FA determines mandatory training, education and experience requirements for a par...
Exam (elaborations)
Acq 101 -Mod 4 Question and answers rated A+ 2023/2024
Acq 101 -Mod 4 Question and answers rated A+ 2023/2024Which of the following are purposes of the Defense Acquisition System? (Select all that apply) - correct answer Develop technology, Produce weapons system, Provide logistics support 
 
Documents produced during the JCIDS process are used to support Defense Acquisition System milestone decisions. - correct answer True 
 
Which of the following are characteristics of the Materiel Solution Analysis phase? (Select all that apply) - correct answer...
Exam (elaborations)
ACQ 101 Module 01 Exams Questions with complete solution 2023/2024
ACQ 101 Module 01 Exams Questions with complete solution 2023/2024Which of the following are considered primary objectives of System Acquisition Management? - correct answer Satisfy the needs of the operational Users 
Provide Measurable Improvements in functional capabilities 
Acquire products in a timely manner at a fair and reasonable cost 
 
An example of better buying power in practice would be limiting the number of contractors that can bid on a contract to those that have provided low-cost...
Exam (elaborations)
ACQ 101 MODULE 1 Question and answers correctly solved 2023/2024
ACQ 101 MODULE 1 Question and answers correctly solved 2023/2024 A system can be defined as - correct answer all elements needed to assist the DoD to conduct its mission of deterring or winning the war 
 
Which of the following a key characteristic of Program Level Integrated Project Teams? - correct answer They focus on program execution 
 
Select the Department of Defense decision-support system described as "This is the process by which the DoD identifies, assesses, and prioritizes the cap...
Exam (elaborations)
ACQ 101 Module 08 & Exam Contract Management Question and answers correctly solved 2023/2024
ACQ 101 Module 08 & Exam Contract Management Question and answers correctly solved 2023/2024 
Which of the following requirements must an offer meet? (Select all that apply) - correct answer *Be clear and unambiguous* 
*Have complete terms* 
*Be communicated* 
*Express intent* 
 
Select the element of contract that best fits the definition of "something of equal value must be exchanged": - correct answer *Consideration* 
 
A mutual assent is when a contract is formed by acceptance of an offer...
Exam (elaborations)
ACQ 101 Terms Question and answers 2023/2024 verified to pass
ACQ 101 Terms Question and answers 2023/2024 verified to passAcquisition - correct answer DOD terms; Acquisition encompasses the design, engineering, consturction, testing, deployment, sustainment, and disposal of weapons or related items purchased from a contractor. From a policy perspective, federal regulations and federal law use the terms acquisition and procurement (do not confuse with budget definition) interchangeably. 
 
JCIDS - correct answer Part of 3-step process a weapon system must ...
Exam (elaborations)
ACQ 101 Question and answers already passed 2023/2024
ACQ 101 Question and answers already passed 2023/2024 
Major Capabilities Acquisition Pathway Structure - correct answer The structure of a DoD acquisition program and the procedures used should be tailored as much as possible to the characteristics of the product being acquired, and to the totality of circumstances associated with the program, including operational urgency and risk factors. 
 
Major Capabilities Acquisition Pathway Structure- Milestones - correct answer The Major Capability Ac...
Exam (elaborations)
ACQ 120 Exam 2 Question and answers 100% correct 2023/2024
ACQ 120 Exam 2 Question and answers 100% correct 2023/2024T/F The directorate of Defense Trade Control divisions provide State Department decisions on US industry applications for export licenses. - correct answer T 
 
The bureau of Political Military Affairs provides policy direction in all of the following areas except which one? - correct answer International Economics 
 
T/F For defense trade advocacy requests, the BIS coordinates the interagency policy review with the support of the Dept o...
Exam (elaborations)
ACQ 120 MODULE 10 Question and answers rated A+ 2023/2024
ACQ 120 MODULE 10 Question and answers rated A+ 2023/2024 
 
Which of the following best reflects the DoD position on Foreign Military Sales (FMS) versus Direct Commercial Sales (DCS)? - correct answer DoD is generally neutral 
 
What is the purpose of P&A data? - correct answer Provide Rough Order of Magnitude (ROM) estimate reflecting projected cost and availability 
 
Building Partner Capacity (BPC) programs are initiated when the foreign government 
submits a Letter of Request (LOR) to an im...