- Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about ? On this page you'll find 7 study documents about .

All 7 results

Sort by

VA CONTRACTORS: GENERAL (CLASS A  OR B) EXAM QUESTIONS AND VERIFIED ANSWERS
  • VA CONTRACTORS: GENERAL (CLASS A OR B) EXAM QUESTIONS AND VERIFIED ANSWERS

  • Exam (elaborations) • 37 pages • 2025
  • VA CONTRACTORS: GENERAL (CLASS A OR B) EXAM QUESTIONS AND VERIFIED ANSWERS Which of the following estimating methods is typically used by the architect rather than the contractor? - correct answer- Conceptual estimate An agreement that calls for a contractor to be paid actual costs for labor and materials plus a fixed fee for the contractor's overhead and profit is called a... - correct answer- cost plus contract Equipment needs for a project are BEST estimated
    (0)
  • $7.99
  • + learn more
VA Contractors: General (Class A  or B) Exam Practice Exam With Complete Questions  And Correct Answers With Rationales  Guaranteed Pass|| Latest Update
  • VA Contractors: General (Class A or B) Exam Practice Exam With Complete Questions And Correct Answers With Rationales Guaranteed Pass|| Latest Update

  • Exam (elaborations) • 10 pages • 2025
  • Available in package deal
  • VA Contractors: General (Class A or B) Exam Practice Exam With Complete Questions And Correct Answers With Rationales Guaranteed Pass|| Latest Update material or equipment supplier - ANSWER-shop drawings that clarify the architect's drawings and specifications are often provided by job cost system - ANSWER-costs are accumulated by individual jobs when material is issued and labor costs incurred (estimated vs actual cost). Builder Risk Insurance - ANSWER-protect the contractor...
    (0)
  • $10.49
  • + learn more
VA CONTRACTORS: GENERAL (CLASS A  OR B) EXAM QUESTIONS AND VERIFIED ANSWERS
  • VA CONTRACTORS: GENERAL (CLASS A OR B) EXAM QUESTIONS AND VERIFIED ANSWERS

  • Exam (elaborations) • 7 pages • 2025
  • Available in package deal
  • VA CONTRACTORS: GENERAL (CLASS A OR B) EXAM QUESTIONS AND VERIFIED ANSWERS Which of the following estimating methods is typically used by the architect rather than the contractor? - correct answer- Conceptual estimate An agreement that calls for a contractor to be paid actual costs for labor and materials plus a fixed fee for the contractor's overhead and profit is called a... - correct answer- cost plus contract Equipment needs for a project are BEST estimated ...
    (0)
  • $11.99
  • + learn more
VA CONTRACTORS: VA ADVANCED (CLASS A) ACTUAL EXAM QUESTIONS WITH VERIFIED ANSWER LATEST UPDATE
  • VA CONTRACTORS: VA ADVANCED (CLASS A) ACTUAL EXAM QUESTIONS WITH VERIFIED ANSWER LATEST UPDATE

  • Exam (elaborations) • 10 pages • 2025
  • Available in package deal
  • VA CONTRACTORS: VA ADVANCED (CLASS A) ACTUAL EXAM QUESTIONS WITH VERIFIED ANSWER LATEST UPDATE
    (0)
  • $13.99
  • + learn more
VA Contractors: General (Class A or B) Test Questions and Answers 100% Pass
  • VA Contractors: General (Class A or B) Test Questions and Answers 100% Pass

  • Exam (elaborations) • 5 pages • 2025
  • Which of the following estimating methods is typically used by the architect rather than the contractor? - Answer Conceptual estimate An agreement that calls for a contractor to be paid actual costs for labor and materials plus a fixed fee for the contractor's overhead and profit is called a... - Answer cost plus contract Equipment needs for a project are BEST estimated by... - Answer Calculating the number of hours or days it is needed What type of insurance is needed for a partners...
    (0)
  • $11.99
  • + learn more
PSI Practice Test Complete Version with Verified Solutions
  • PSI Practice Test Complete Version with Verified Solutions

  • Exam (elaborations) • 11 pages • 2025
  • In the previous year, a company had revenues of $500,000, project overhead of $40,000 and company overhead of $75,000. The company expects the percentage for project and company overhead to remain the same for the current year. The company desires to make a 10% profit on a project it is bidding. The project would have $80,000 in direct costs. What should the bid price be? - Answer Between $110,000 and $120,000 Which of the following is considered ethical behavior? - Answer Failing to disclose...
    (0)
  • $11.49
  • + learn more
VA Contractors Advanced Class A Exam | 2025–2026 Verified Questions with Correct Answers | Graded A Plus
  • VA Contractors Advanced Class A Exam | 2025–2026 Verified Questions with Correct Answers | Graded A Plus

  • Exam (elaborations) • 7 pages • 2025
  • The VA Contractors Advanced (Class A) Exam 2025–2026 features recently revised and verified questions with 100% correct answers. Graded A+, it covers Virginia contractor laws, financial management, safety codes, and construction practices — everything you need to pass the Class A license exam confidently.
    (3)
  • $16.49
  • 4x sold
  • + learn more