1. The primary responsibility of a Certified Asbestos Management
Planner is to:
A. Perform bulk asbestos sampling
B. Supervise asbestos abatement workers
C. Develop and implement an asbestos management plan
D. Conduct air monitoring only
Correct Answer: C
Rationale: An asbestos management planner is responsible for creating,
maintaining, and implementing a comprehensive management plan to
prevent asbestos exposure, not performing abatement or sampling.
, 2. Which regulation primarily governs asbestos management plans in
schools in the United States?
A. OSHA 29 CFR 1910
B. NESHAP
C. AHERA
D. TSCA Title I
Correct Answer: C
Rationale: The Asbestos Hazard Emergency Response Act (AHERA)
specifically requires asbestos inspections and management plans for
schools.
3. An asbestos management plan must be updated at least:
A. Annually
B. Every three years
C. Every five years
D. Only after abatement
Correct Answer: B
Rationale: AHERA requires re-inspections every three years and updates to
the asbestos management plan accordingly.
4. Which material is considered friable asbestos-containing material
(ACM)?
, A. Vinyl asbestos tile
B. Cement pipe
C. Thermal system insulation
D. Asphalt roofing
Correct Answer: C
Rationale: Thermal system insulation is typically friable and can be
crumbled by hand pressure, making it higher risk.
5. The first step in developing an asbestos management plan is:
A. Selecting response actions
B. Conducting a building inspection
C. Notifying building occupants
D. Performing air sampling
Correct Answer: B
Rationale: A comprehensive inspection identifies the location, quantity,
and condition of ACM, forming the basis of the plan.
6. Which professional is authorized to conduct AHERA inspections?
A. Industrial hygienist
B. Project designer
C. Certified asbestos inspector
D. Management planner
, Correct Answer: C
Rationale: AHERA requires that inspections be conducted by accredited
asbestos inspectors.
7. Damage assessment of ACM should be performed:
A. Only during re-inspection
B. After abatement
C. During initial inspection and periodic surveillance
D. Only if complaints occur
Correct Answer: C
Rationale: Ongoing surveillance ensures changes in ACM condition are
identified and managed promptly.
8. Which response action is MOST appropriate for severely damaged
friable ACM?
A. Encapsulation
B. Enclosure
C. Repair
D. Removal
Correct Answer: D
Rationale: Severely damaged friable ACM poses high exposure risk and
typically requires removal.
Planner Practice Exam Questions And
Correct Answers (Verified Answers) Plus
Rationales 2026 Q&A | Instant
Download Pdf
1. The primary responsibility of a Certified Asbestos Management
Planner is to:
A. Perform bulk asbestos sampling
B. Supervise asbestos abatement workers
C. Develop and implement an asbestos management plan
D. Conduct air monitoring only
Correct Answer: C
Rationale: An asbestos management planner is responsible for creating,
maintaining, and implementing a comprehensive management plan to
prevent asbestos exposure, not performing abatement or sampling.
, 2. Which regulation primarily governs asbestos management plans in
schools in the United States?
A. OSHA 29 CFR 1910
B. NESHAP
C. AHERA
D. TSCA Title I
Correct Answer: C
Rationale: The Asbestos Hazard Emergency Response Act (AHERA)
specifically requires asbestos inspections and management plans for
schools.
3. An asbestos management plan must be updated at least:
A. Annually
B. Every three years
C. Every five years
D. Only after abatement
Correct Answer: B
Rationale: AHERA requires re-inspections every three years and updates to
the asbestos management plan accordingly.
4. Which material is considered friable asbestos-containing material
(ACM)?
, A. Vinyl asbestos tile
B. Cement pipe
C. Thermal system insulation
D. Asphalt roofing
Correct Answer: C
Rationale: Thermal system insulation is typically friable and can be
crumbled by hand pressure, making it higher risk.
5. The first step in developing an asbestos management plan is:
A. Selecting response actions
B. Conducting a building inspection
C. Notifying building occupants
D. Performing air sampling
Correct Answer: B
Rationale: A comprehensive inspection identifies the location, quantity,
and condition of ACM, forming the basis of the plan.
6. Which professional is authorized to conduct AHERA inspections?
A. Industrial hygienist
B. Project designer
C. Certified asbestos inspector
D. Management planner
, Correct Answer: C
Rationale: AHERA requires that inspections be conducted by accredited
asbestos inspectors.
7. Damage assessment of ACM should be performed:
A. Only during re-inspection
B. After abatement
C. During initial inspection and periodic surveillance
D. Only if complaints occur
Correct Answer: C
Rationale: Ongoing surveillance ensures changes in ACM condition are
identified and managed promptly.
8. Which response action is MOST appropriate for severely damaged
friable ACM?
A. Encapsulation
B. Enclosure
C. Repair
D. Removal
Correct Answer: D
Rationale: Severely damaged friable ACM poses high exposure risk and
typically requires removal.