Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

TCM 121 TEST 1 | QUESTIONS AND ANSWERS | 2025/2026 UPDATE | ALREADY PASSED

Document preview thumbnail
Preview 2 out of 5 pages

TCM 121 TEST 1 | QUESTIONS AND ANSWERS | 2025/2026 UPDATE | ALREADY PASSEDTCM 121 TEST 1 | QUESTIONS AND ANSWERS | 2025/2026 UPDATE | ALREADY PASSED

Content preview

TCM 121 Exam 1 Basic terms and
knowledge QUESTIONS AND ANSWERS


Design Team - ANS>>Architects, engineers, other consultants
ll ll ll ll ll ll




Construction team - ANS>>general contractor, subcontractors, suppliers
ll ll ll ll ll ll




Owner group - ANS>>developer/owner, financers, user groups
ll ll ll ll ll ll




Design/Bid/Build - ANS>>-The owner hires separate design and construction teams ll ll ll ll ll ll ll ll ll




-Separate entities provide checks and balances
ll ll ll ll ll




-Difficult to integrate construction expertise into the design
ll ll ll ll ll ll ll




-less risk ll




-1. owner 2. G. contractor or architect 3. Subcontractor
ll ll ll ll ll ll ll ll




-



Design/Build - ANS>>-owner hires single design and construction entity
ll ll ll ll ll ll ll ll




1. owner 2. architect (design) - contractor
ll ll ll ll ll ll




Fixed fee (lump sum) - ANS>>Owner pays an agreed, fixed amount for work to be performed,
ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll



GC assumes most risk or potential reward for unplanned construction costs or savings
ll ll ll ll ll ll ll ll ll ll ll ll ll




Cost Plus a Fee - ANS>>Owner pays GC's direct costs plus an added fee, owner assumes more
ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll



cost risk/ savings reward potential.
ll ll ll ll ll

, Incentive provisions - ANS>>financially reward the contractor for the timely completion of cost
ll ll ll ll ll ll ll ll ll ll ll ll



savings
ll




Surety Bonds - ANS>>purchased by the owner, protect against contractor default
ll ll ll ll ll ll ll ll ll ll




Construction Scheduling - ANS>>understanding the interdependencies in time and space
ll ll ll ll ll ll ll ll ll



between parts of the building is essential to planning the construction project
ll ll ll ll ll ll ll ll ll ll ll ll




*Sequential Construction - ANS>>- Each major phase begins only after the preceding phase is
ll ll ll ll ll ll ll ll ll ll ll ll ll



complete
ll




-Design is completed before construction begins
ll ll ll ll ll




Phased Construction - ANS>>-Design and Construction phases overlap
ll ll ll ll ll ll ll




-The aim is to reduce the total project duration
ll ll ll ll ll ll ll ll




Gantt Chart - ANS>>-Represents project tasks or phases on a horizontal timeline
ll ll ll ll ll ll ll ll ll ll ll




-Provide an easy-to-understand picture of a project schedule and relationships between phases.
ll ll ll ll ll ll ll ll ll ll ll




Critical Path Method (CPM) - ANS>>-the sequence of tasks that determines the least amount of
ll ll ll ll ll ll ll ll ll ll ll ll ll ll



time in which a project can be completed
ll ll ll ll ll ll ll ll




-Analyzes task dependencies ll ll




Longest path ll




General Contractor - ANS>>-Oversees construction
ll ll ll ll




-controls the project site ll ll ll




-manages trades and suppliers ll ll ll

Document information

Uploaded on
December 16, 2025
Number of pages
5
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
1
Followers
1
Items
170
Last sold
9 months ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions