One cadvantage cof c100% cinspection cover csampling
inspection cis cthat c100% cinspection
(A) cprovides cmore cinformation cabout cquality clevels
(B) cgives czero cdefects cto cthe ccustomer
(C) creduces cthe cpersonal cbias cof cthe cinspector
(D) crequires cless cmachine-operator ctraining c- cCORRECT cANS✔✔A cprovides cmore cinformation
When cthe cterm c"R c& cR" cis capplied cto cdigital ccalipers, cit
refers cto
(A) cremoval cand creplacement
(B) crelativity cand creproducibility
(C) crepeatability cand creliability
(D) crepeatability cand creproducibility c- cCORRECT cANS✔✔D crepeatability cand creproducibility
The cproper cmethod cof cplacing cparts con ca csurface cplate cand cthen cremoving cthem cis
(A) crotate con cand cslide coff
(B) crotate con cand clift coff
(C) cset con cand cslide coff
(D) cset con cand clift coff c- cCORRECT cANS✔✔A crotate con cand cslide coff
Who cis cresponsible cfor cdetermining cwhether ca cfollow-up cresponse cis csufficient cto cclose cout ca
(A) cExecutive cmanagement
(B) cThe cquality cmanager
(C) cThe caudit cteam cleader
(D) cThe cinternal cauditee c- cCORRECT cANS✔✔C cThe caudit cteam cleader
Which cof cthe cfollowing cmethods cis cused cto cdevelop can cexhaustive clist cof cideas cabout ca csubje
(A) cGoal-setting
(B) cBrainstorming
(C) cBenchmarking
(D) cProblem-solving c- cCORRECT cANS✔✔B cBrainstorming
A cdocument cthat casserts cthat ca cproduct cconforms cto
specification cis cknown cas ca ccertificate cof
(A) cqualification
, (A) c15.73%
(B) c19.15%
(C) c47.72%
(D) c83.99% c- cCORRECT cANS✔✔D c83.99%
In cpreparation cfor cconstruction cof ca ccause cand ceffect
diagram, cit cis cimportant cto
(A) cplot cseparate ccharts cfor ceach csource
(B) cfocus conly con cwhat cmakes cthings cgo cwrong
(C) crecord ceverything cpeople csuggest
(D) cvalidate cpossible croot ccauses c- cCORRECT cANS✔✔C crecord ceverything cpeople csuggest
A cquality ctechnician cuses ca cc cchart cto cmonitor cthe cnumber cof cdefects cin ca csquare cfoot cof cma
cperiod, cthe cmean cnumber cof cdefects cis ccalculated cat c13.5. cWhat cshould cthe ccontrol climits cbe
LCL cUCL
(A) c0.00 c54.00
(B) c0.00 c27.00
(C) c2.48 c24.52
(D) c9.83 c17.17 c- cCORRECT cANS✔✔C c2.48 c24.52
-
c- c-
c- c-
- c-
- c-
- c----------
The cshape cof cthe cdistribution cabove cis cbest cdescribed cas
(A) cnormal
(B) cmulti-modal
(C) cpositively cskewed
(D) cnegatively cskew c- cCORRECT cANS✔✔C cpositively cskewed
A cmaterial creview cboard c(MRB) cusually chas cthe
responsibility cfor cwhich cof cthe cfollowing?
(A) cAnalyzing cand cdispositioning cof cnonconforming
material
(B) cDefining cthe cstatistical cspecifications cof
nonconforming cmaterial
(C) cAssuring cthe cavailability cof cmaterials cto cmeet
production cschedules
(D) cControlling cthe ccost cof cmaterials c- cCORRECT cANS✔✔A cAnalyzing cand cdispositioning cof c
material
The cmost ccommon cform cof cspecification cin cmanufacturing
facilities cis cthe
(A) ccontrol cplan
(B) coperator cinstruction csheet
(C) cblueprint
(D) cin-process ccheck csheet c- cCORRECT cANS✔✔C cblueprint
Statistical cquality ccontrol cgenerally crequires cinspection cto cbe cconducted
(A) cat cthe cwarehouse cto cmaintain cquality cof cparts cin cstorage
(B) cimmediately cafter cthe cproduction crun chas cbeen
completed
(C) cclose cto cthe cpoint cof cproduction cof cthe cpart