PAPER 2026 QUESTIONS WITH ANSWERS
GRADED A+
◉ Which section of the Uniform Contract Format (UCF) matches
with Contract Administration Data (including LOAs/ACRNs)?
Answer: Section G of the Uniform Contract Format (UCF) matches
Contract Administration Data (including LOAs/ACRNs).
◉ A provisional agreement between the contractor and the
government that contains certain designated clauses that will be
incorporated by reference in future negotiated contracts is a
__________________. Answer: A provisional agreement between the
contractor and the government that contains certain designated
clauses that will be incorporated by reference in future negotiated
contracts is a basic agreement.
◉ An agreement between the contractor and the government that
includes a description, as specific as practicable, of the supplies to be
furnished or services to be performed when ordered and a
description of the method of determination of the prices to be paid
is a _______________. Answer: An agreement between the contractor
and the government that includes a description, as specific as
practicable, of the supplies to be furnished or services to be
performed when ordered and a description of the method of
determination of the prices to be paid is a basic ordering agreement.
, ◉ Delivery Orders (DO) are orders for services written against an
IDIQ contract. A DO calls directly for a contractor's time and effort
rather than for a concrete end product. Answer: False. Task Orders
(TO) are orders for services written against an IDIQ contract. A TO
calls directly for a contractor's time and effort rather than for a
concrete end product.
◉ As a COR, what is the first thing you should do if you think a
contract needs to be changed? Answer: As a COR, the first thing you
should do if you think a contract needs to be changed is to talk to the
KO, who has the authority to modify a contract.
◉ Before any contract scope determinations on a modification can
be made, the COR must know what is already contained in the
contract. Answer: True. Before any contract scope determinations on
a modification can be made, the COR must know what is already
contained in the contract.
◉ A cardinal change is a modification to a contract that is: Answer: A
cardinal change is a modification to a contract that is outside the
scope of the contract.
◉ The COR may have a significant role in negotiating a modification
by: (Select all that apply.) Answer: The COR may have a significant