Learn 1 /7 Study with Learn
Linear Foot
Choose an answer
1 Estimating 2 Addendum
3 LF 4 Quantity survey
Don't know?
Terms in this set (115)
, The process of determining the anticipated cost of
Estimating materials, labor, and equipment of a proposed
project.
The process in which detailed lists are compiled,
based on drawings and specifications, of all the
Take-off material and equipment necessary to construct a
project. The cost estimator uses this list to calculate
how much it will cost to build the project.
Measured amounts of construction items expressed in
Quantities
their customary units.
In estimating an activity to translate project scope
Quantification
information into resource quantities suitable for
A detailed analysis of material and equipment
Quantity survey
required to construct a project.
A measurement of a given planar region or of the
Area
surface of a solid.
A construction cost estimating system employing unit
Area method square foot costs multiplied by the adjusted gross
floor area of a building.
Length The longest dimension of an object.
A unit or system of units for measuring length:
Linear measurement 12" = 1', 3' = 1 yard, 1 yard = 0.9144
meters, 1 mile = 5,280 feet.
Dimension A distance between two points, lines, or planes.
Documents that define the qualitative requirements
Specifications for products, materials, and workmanship upon which
the contract for construction is based.
Graphic illustrations depicting the dimensions, design,
Drawings and location of a project. Generally including plans,
elevations, details, diagrams, schedules, and sections.
COMPREHENSIVE QUESTIONS AND VERIFIED
ANSWERS
Save
Practice questions for this set
Learn 1 /7 Study with Learn
Linear Foot
Choose an answer
1 Estimating 2 Addendum
3 LF 4 Quantity survey
Don't know?
Terms in this set (115)
, The process of determining the anticipated cost of
Estimating materials, labor, and equipment of a proposed
project.
The process in which detailed lists are compiled,
based on drawings and specifications, of all the
Take-off material and equipment necessary to construct a
project. The cost estimator uses this list to calculate
how much it will cost to build the project.
Measured amounts of construction items expressed in
Quantities
their customary units.
In estimating an activity to translate project scope
Quantification
information into resource quantities suitable for
A detailed analysis of material and equipment
Quantity survey
required to construct a project.
A measurement of a given planar region or of the
Area
surface of a solid.
A construction cost estimating system employing unit
Area method square foot costs multiplied by the adjusted gross
floor area of a building.
Length The longest dimension of an object.
A unit or system of units for measuring length:
Linear measurement 12" = 1', 3' = 1 yard, 1 yard = 0.9144
meters, 1 mile = 5,280 feet.
Dimension A distance between two points, lines, or planes.
Documents that define the qualitative requirements
Specifications for products, materials, and workmanship upon which
the contract for construction is based.
Graphic illustrations depicting the dimensions, design,
Drawings and location of a project. Generally including plans,
elevations, details, diagrams, schedules, and sections.