_________ are necessary for complete combustion - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔time, temperature, mixture, and atomization
|\ |\ |\ |\ |\
if the steam pressure gauge indicates 200 PSIG, the absolute
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
pressure is______ - CORRECT ANSWERS ✔✔214.7
|\ |\ |\ |\ |\
a boiler is operating at 400 PSI, and the safety valve opens at
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
410 PSI and closes at 398 PSI. The blowdown is______psi -
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔12 |\ |\
an oil cooler is commonly used with a(n) ________ when operating
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
in conjunction with a turbo-generator - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\ |\ |\
✔✔steam turbine |\
a boiler is producing 40,000lb of steam/hr at a pressure of 100
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
PSI and a steam temperature of 500 degrees Fahrenheit. The
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
steam produced is _______ steam - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\ |\
✔✔superheated
the economizer on a boiler is used to _______ - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔add heat to the feed water |\ |\ |\ |\ |\ |\
,blowers are normally used with________ boilers - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔water tube |\ |\
overheating of tubes on a boiler can be caused by________ -
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔scale on tubes|\ |\ |\ |\
carbon dioxide in a condensate return system causes_________ -
|\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔channeling |\ |\
a ________ pump is a positive displacement pump - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔reciprocating |\
a boiler generating 6000 lb of steam/hr produces _______btu/hr -
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔6,000,000 |\ |\
a bottom blowdown is performed on a boiler to _____ - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔discharge sludge and sediment
|\ |\ |\ |\
water columns are connected to the boiler with a minimum of
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
_______" pipe - CORRECT ANSWERS ✔✔1
|\ |\ |\ |\ |\
the minimum size of a water column blowdown valve is_______". -
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔3/4
|\ |\ |\
the maximum size bottom blowdown valve on a boiler
|\ |\ |\ |\ |\ |\ |\ |\ |\
is_________". - CORRECT ANSWERS ✔✔2 1/2 |\ |\ |\ |\ |\
,a ________ allows condensate to pass through, but stops Steam. -
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔a steam trap |\ |\ |\ |\
when taking over a shift, the first thing to do is check the________
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
- CORRECT ANSWERS ✔✔water level in each boiler
|\ |\ |\ |\ |\ |\ |\ |\
according to the asme code, a high-pressure boiler having more
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
than 500 square feet of heating surface shall have________ -
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔two or more safety valves |\ |\ |\ |\ |\ |\
the probable cause of an increase in temperature of gases of
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
combustion at the boiler Outlet is____ - CORRECT ANSWERS |\ |\ |\ |\ |\ |\ |\ |\ |\
✔✔dirty heating services |\ |\
boilers in battery equipped with________ must have two main
|\ |\ |\ |\ |\ |\ |\ |\ |\
steam stop valves and a free-flowing drain between them -
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔manhole openings |\ |\ |\
in order to be sure the gauge glass is indicating an accurate
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
water level reading, the stationary engineer should______ -
|\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔blowdown the gauge glass |\ |\ |\ |\ |\
a continuous blowdown line is located___ - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\ |\ |\
✔✔in the Steam and water drum well below the nowl
|\ |\ |\ |\ |\ |\ |\ |\ |\
a temperature reading of 80 degrees Celsius is equal
|\ |\ |\ |\ |\ |\ |\ |\ |\
to_________°f - CORRECT ANSWERS ✔✔176 |\ |\ |\ |\
, a chimney temperature of 250 degrees Fahrenheit above steam
|\ |\ |\ |\ |\ |\ |\ |\ |\
temperature indicates_______ - CORRECT ANSWERS ✔✔poor
|\ |\ |\ |\ |\ |\
efficiency
a manometer is red in________ - CORRECT ANSWERS ✔✔inches of
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
water
the boiling point of water will____ with an increase in pressure -
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔be raised
|\ |\ |\
if a lather is not obtained when performing a soap hardness test,
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
the water sample is_______ - CORRECT ANSWERS ✔✔hard
|\ |\ |\ |\ |\ |\ |\
combustion efficiency can be increased when air is________ -
|\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔preheated
|\ |\
______ draft is produced by a fan located between the boiler and
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
the chimney - CORRECT ANSWERS ✔✔induced
|\ |\ |\ |\ |\
the overspeed trip on a steam turbine should be tested ______ -
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔before putting the steam turbine on-line
|\ |\ |\ |\ |\ |\ |\
a high CO2 reading in the gases of combustion is a sign of____ -
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔High combustion efficiency
|\ |\ |\ |\