DPWH PE 2 EXAM PREP | MOCK TEST QUESTIONS AND ANSWERS

Institution
DPWH PE 2
Course
DPWH PE 2









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
DPWH PE 2
Course
DPWH PE 2

Document information

Uploaded on
December 5, 2025
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

DPWH PE 2 EXAM PREP | MOCK
TEST QUESTIONS AND
ANSWERS

What is the minimum average compressive strength for a non-load bearing Concrete
Hollow Block (DO 80 s2018) - Answer- 600 psi

How many pieces of Concrete Hollow Blocks (CHB0 per square meter are used in the
Cost Estimation (DO 137 s2017) - Answer- 13

What is the cement sand ration to achieve 500 psi Concrete Hollow Blocks (CHB)
(Simplified Construction Handbook for School Buildings, DPWH - May 2014) - Answer-
1:6

What is the mix ration by volume of the mortar used in the installation of CHB and
Louver Blocks (DO 80 s2018) - Answer- 1 part cement : 3 part sand

What is the minimum corrugation overlap on roofing sheet installation (Simplified
Construction Handbook for School Buildings, DPWH - May 2014) - Answer- 250mm

What is the design standard width for tourism and farm to market road projects (DO 15
s2020) - Answer- Minimum 6.1m for two-lanes

How many project billboards are installed for each road/bridge/flood control project (DO
21 s2017) - Answer- 2

What is the dimension of a DPWH project billboard (DO 21 s2017) - Answer- 4 ft x 8 ft

Is the total estimated cost of the project which covers the Civil Works, Engineering
Supervision and Administrative Overhead, Road Right-of-Way Acquisition, Construction
Contingency. Include information about the project location and limits, quantity and unit
cost of each item of work, construction duration, funding source, equipment
requirement, etc. (DO 137 s2017) - Answer- Program of Works (POW)

Is the total estimated agency estimate (direct cost, indirect cost and tax) for civil works
contract of infrastructure projects, wherein it is the ceiling of award of contract for
government locally-funded projects and reference for comparison of bid costs of
contractors for both locally-funded and foreign assisted projects. (DO 137 s2017) -
Answer- Approved Budget for Contract (ABC)

, Is the determination of reasonable unit cost of each item of work which reflects the
breakdown showing quantities of work items, unit price of materials, equipment rental
rates, labor rates and DPWH-prescribed indirect costs including taxes (DO 137 s2017) -
Answer- Detailed Unite Price Analysis (DUPA)

One-storey up to 5-storeys in height, i.e. from 3m up to a maximum of 15m above
established grade (DO 137 s2017) - Answer- Low Rise Building

On the preparation of Detailed Unit Price Analysis, allowance for waste and/or losses
shall not exceed __ % of the materials requirement (DO 137 s2017) - Answer- 5%

How many percent is shrinkage factor used for material cost estimation of Embankment
from Common Borrow by Equipment (DO 137 s2017) - Answer- 25%

How many percent is shrinkage factor used for material cost estimation of Gravel
Bedding (DO 137 s2017) - Answer- 5%

What is the minimum cement content per cubic meter on a Class A concrete (Item 405
Blue Book, DO 137 s2017) - Answer- 9.1

What is the minimum cement content per cubic meter on a Class C concrete (Item 405
Blue Book, DO 137 s2017) - Answer- 9.5

What is the minimum cement content per cubic meter on a Lean Concrete (for manual
mixing) (DO 137 s2017) - Answer- 6

What is the rate of application in Items 301 Bituminous Prime Coat (Blue Book) -
Answer- 1 to 2 liters/m2

What is the unit weight of a 10mm diameter RSB (PNS 49) - Answer- 0.617

What is the nominal weight of 16mm diameter x 6m length RSB (PNS 49) - Answer-
9.468

What is the minimum vertical clearance above roadway for Railways, Flyover and
Bridge along and crossing national highways (DO 53 s2016) - Answer- 5.03m

What is the minimum vertical clearance above roadway for Pedestrian Foot Bridge
crossing national highways (DO 53 s2016) - Answer- 5.33m

What is the minimum head room between the pedestrian walking surface of girder of
structure (Railway, flyover or bridge) above (DO 53 s2016) - Answer- 2m

The authority to approve the termination of contract for the Regional Projects (DO 90
s2020) - Answer- The incumbent Regional Director

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
wisdompoint chamberlain college of nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
114
Member since
2 year
Number of followers
66
Documents
5307
Last sold
1 day ago
Nursing Tec

3.7

16 reviews

5
6
4
3
3
5
2
0
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions