Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Maine Fuel Board Rules: Propane and Natural Gas Exam Questions & Answers Correctly Solved

Rating
-
Sold
-
Pages
2
Grade
A+
Uploaded on
03-12-2025
Written in
2025/2026

Any existing code violations must be reported to the ___ in writing - ANSWER-owner All gas fired burner must be installed with a properly installed and operating ___ (what shuts off the system when there isn't proper water flow) - ANSWER-low water cut-off Where is the low water cut off never installed? - ANSWER-Below the crown sheet Where may the low water cut off be installed if not directly in the boiler? - ANSWER-On the main supply line (vertical riser) as close to boiler as possible, or in water column of continuous piping attached directly to boiler No valves or obstructions shall be installed between boiler and ___ - ANSWER-safety controls Licensee must retain a copy of heat loss system design and system load calculations so that it may be produced for... - ANSWER-inspection upon request from the board Installer must obtain written verification from the manufacturer of the appliance when converting... - ANSWER-appliance from gas to another fuel source (below 400,000 btu) Oil tank requirement when converting to an alternative fuel: fill pipe must be removed completely and tank must be plugged... - ANSWER-...with a threaded black iron plug Oil tank requirement when converting to an alternative fuel: which line must be removed? - ANSWER-Burner supply line Electrical code is handled under which code? - ANSWER-NFPA 70

Show more Read less
Institution
Maine Fuel Board Rules
Course
Maine Fuel Board Rules

Content preview

Maine Fuel Board Rules: Propane and Natural Gas Exam Questions & Answers
Correctly Solved


Any existing code violations must be reported to the ___ in writing - ANSWER-owner


All gas fired burner must be installed with a properly installed and operating ___ (what
shuts off the system when there isn't proper water flow) - ANSWER-low water cut-off


Where is the low water cut off never installed? - ANSWER-Below the crown sheet


Where may the low water cut off be installed if not directly in the boiler? - ANSWER-On
the main supply line (vertical riser) as close to boiler as possible, or in water column of
continuous piping attached directly to boiler


No valves or obstructions shall be installed between boiler and ___ - ANSWER-safety
controls


Licensee must retain a copy of heat loss system design and system load calculations so
that it may be produced for... - ANSWER-inspection upon request from the board


Installer must obtain written verification from the manufacturer of the appliance when
converting... - ANSWER-appliance from gas to another fuel source (below 400,000 btu)


Oil tank requirement when converting to an alternative fuel: fill pipe must be removed
completely and tank must be plugged... - ANSWER-...with a threaded black iron plug


Oil tank requirement when converting to an alternative fuel: which line must be
removed? - ANSWER-Burner supply line


Electrical code is handled under which code? - ANSWER-NFPA 70

Written for

Institution
Maine Fuel Board Rules
Course
Maine Fuel Board Rules

Document information

Uploaded on
December 3, 2025
Number of pages
2
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$11.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
IMORA West Virginia University
View profile
Follow You need to be logged in order to follow users or courses
Sold
214
Member since
3 year
Number of followers
77
Documents
5091
Last sold
1 week ago

4.4

70 reviews

5
50
4
8
3
8
2
1
1
3

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions