100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

NCCCO Telescopic Core 2025/2026 | CRT-001 | 100+ Solved Questions – Boom Configuration, Jib Safety & Load Control

Rating
-
Sold
-
Pages
6
Grade
A+
Uploaded on
30-11-2025
Written in
2025/2026

This document contains 100+ expertly solved exam questions and answers designed for the NCCCO Telescopic Core 2025/2026 Certification, under course code CRT-001, following the requirements of the Crane Institute Certification (CIC) and fully aligned with OSHA 1926 Subpart CC and ASME B30.5 standards. It provides essential test preparation focused on telescopic boom crane configuration, load handling, personnel lifting, and safe operation in various terrain and setup conditions. The questions are structured around real-world crane operation challenges, covering: Boom and jib setup, including stowed vs. erected position, offset impacts, side-loading hazards, and extension balance Load chart use, capacity deductions, effective weight calculations, and boom angle adjustments for partially extended lifts Personnel lifting requirements, such as anti-two-block systems, boom angle indicators, controlled load lowering, and OSHA 1926.1431 compliance Outrigger and ground support safety, including blocking requirements, corner loading, and float stability Stability and tipping risks, such as backward tipping at short radius, quadrant strength (rear/front/side), and load leverage effects Travel operations, including suspended load control on rough terrain cranes, boom orientation, and tag line safety near power lines Signal and device protocols, such as boom angle indicators, swing path monitors, and lockout systems during two-block activation Crane limitations, including what components can or cannot be removed from carry deck cranes during operation This study material is highly suited for: Candidates preparing for NCCCO telescopic boom core exams Vocational trainees in heavy equipment operation and construction crane programs Engineering students focusing on lifting operations and job site safety Crane operators, riggers, and lifting coordinators managing mobile crane configurations in tight, uneven, or hazardous environments Employers conducting internal safety testing or certification readiness assessments Built around practical OSHA-regulated operations and tested principles, this document supports crane professionals in mastering both exam performance and job site execution. Keywords: NCCCO Telescopic Core 2025, CRT-001, boom extension safety, OSHA 1926.1431, jib offset radius, anti two-block lockout, crane tipping factors, load radius change, swing path stability, side loading risk, tag line use, boom angle indicator, blocking under outriggers, quadrant lifting strength, personnel platform lifting, dynamic load handling, rough terrain travel, effective boom setup

Show more Read less
Institution
Nccco
Course
Nccco









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Nccco
Course
Nccco

Document information

Uploaded on
November 30, 2025
Number of pages
6
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NCCCO Telescopic Core 2025/2026
Exam Questions and Answers | A+ Score
Assured



When lifting off the main boom, how is the effective weight of the fly/jib

different in the erected position from that of the stowed position - 🧠

ANSWER ✔✔a. Effective weight increases


Who must determine maximum speed for a mobile crane to travel with a

suspended load. - 🧠 ANSWER ✔✔The competent person


How does the effective weight of a stowed extension relate to the actual

weight of the extension? - 🧠 ANSWER ✔✔Lower than the actual weight.

, Using a telescopic mobile crane and lifting off the jib with the main boom

partially extended, you should use _________ to determine gross capacity.

- 🧠 ANSWER ✔✔Boom Angle


If not listed in the load\capacity chart or notes for a telescopic boom crane

and you are in between boom lengths, you should: - 🧠 ANSWER ✔✔Use

the lowest shorter or longer.

Which of the following is required to be on a mobile telescopic boom crane

in order to lift a personnel platform. - 🧠 ANSWER ✔✔Boom length indicator


When operating a rough terrain crane and extending the outrigger beams

from the upper cab you should? - 🧠 ANSWER ✔✔Make visual contact with

beam and jack

When a mobile cranes telescopic boom sections are required to be

extended equally and they are not,what effect could be which of the

following? - 🧠 ANSWER ✔✔Damage to the shortest extended section.


What item listed below can be removed from a carry deck mobile crane,

andcontinue to be operational? - 🧠 ANSWER ✔✔Jib/fly/extension


What is the primary reason for lifting off a boom extension mounted on a

mobile telescopic boom crane? - 🧠 ANSWER ✔✔Increase height.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NinjaNerd Liberty University
View profile
Follow You need to be logged in order to follow users or courses
Sold
206
Member since
1 year
Number of followers
4
Documents
12217
Last sold
15 hours ago
NinjaNerd

Here You will All Documents and Package Deals Offered by Seller NinjaNerd.

3.8

31 reviews

5
14
4
5
3
7
2
2
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions