GRADED A+ 100% VERIFIED.
Which is the MAIN purpose of a protected premises fire alarm
system? ANS >> To sound local alarm signals for evacuation of the
protected building
Which type of project document provides information on the
type of competencies and experience available in the project
and the knowledge that may be missing? ANS >> Project team
assignments
,What phases does the NFPA 1600 define? ANS >> Prevention,
mitigation, recovery, and continuity
What percent of volume of container > 55 gallons should
secondary containment be? ANS >> 100%
In the event of a confirmed underground storage tank release,
which set of tasks must the owner perform? ANS >> Initial
response actions, initial abatement measures, a site check, and
a site characterization
Which BEST defines the risk management technique for loss
exposures alternatives called "segregation or separation of
exposure"? ANS >> A technique that isolates or duplicates an
operation, activity, or asset to eliminate exposures to adjacent
operations
Which is a transformation reaction that involves the attack of
an electron-rich water molecule on an electron-poor organic
bond of a hazardous compound? ANS >> Hydrolysis reaction
Foreign Object Damage (FOD) is most likely to be of concern in
which environment? ANS >> An airport runway
, Calculate 8hr OEL of .5ppm for a 10-hour shift. RF=(8/h) (24-
h)/16 ANS >> .35ppm
Which is the BEST way to handle a person loudly snoring during
your safety training? ANS >> As you approach the person,
increase the volume of your voice
How does "ISO 3100 Risk Management: Principal A- Risk
Management Creates and Protects Value" best describe the
concept of protecting value? ANS >> The value created is a
reminded that the costs of implementing risk must be less than
the benefits (in terms of improved achievement of objects) it
provides.
Which are four elements involved in capital projects review and
design procedures? ANS >> Review hazard studies, select plot
plans, review process designs, and develop procedures
Which is the correct sequence of the lockout/tagout process for
a machine shutdown? ANS >> Preparation for shutdown, machine
shutdown, machine isolation, LOTO device application, stored
energy release/restraint, verification