CORRECT 100%
Control chart - ANSWERWhich quality control tool should be used to monitor the current
status or end result of a process?
Technical tools
and
People involvement. - ANSWERWhat are two important aspects of Six Sigma?
Capacity utilization - ANSWERWhich capacity planning measurement tells how much
capacity a company is using?
An effective capacity is lower than design capacity.
Respect for people - ANSWERWhat is the third basic element in the just-in-time (JIT)
system if the first element is total quality management (TQM) and the second is JIT
manufacturing?
Lean systems - ANSWERWhich concept takes a total system approach to creating an
efficient operation and combines concepts such as just-in-time (JIT), total quality
management (TQM), and continuous improvement?
Push moves the product forward in anticipation for demand.
and
Pull eliminates excessive inventory. - ANSWERWhat are two product system
differences between the push and pull processes?
Choose 2 answers
JIT marketing focuses on customer-driven quality. - ANSWERWhich function does
marketing play in a just-in-time (JIT) organization?
Companies are able to reduce waste.
and
Companies develop new ways to generate revenue - ANSWERHow does a just-in-time
(JIT) system influence all functional areas within a company?
Increasing cost effectiveness
and
Becoming more efficient - ANSWERWhat are two strategic objectives for every member
of the supply chain?
Choose 2 answers