100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CBT 222 Exam with All Correct & 100% Verified Answers |Actual Complete Exam| Already Graded A+ (Just Released)

Rating
-
Sold
-
Pages
8
Grade
A+
Uploaded on
27-11-2025
Written in
2025/2026

CBT 222 Exam with All Correct & 100% Verified Answers |Actual Complete Exam| Already Graded A+ (Just Released)

Institution
CBT - Certified Broadcast Technologist
Course
CBT - Certified Broadcast Technologist









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CBT - Certified Broadcast Technologist
Course
CBT - Certified Broadcast Technologist

Document information

Uploaded on
November 27, 2025
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CBT 222 Exam with All Correct & 100% Verified
Answers |Actual Complete Exam| Already Graded A+
(Just Released)

You are the COR are at the government training installation during a Session there is a... To
discontinue work until after class you should request of the contractor take a break ✔Correct
Answer-False

What ethical issue may be encountered bye see you ours during the performance of their duty
✔Correct Answer-All of these answers are correct

Of the following list which one is not an accurate list of the documents required to be maintained in
a COR file ✔Correct Answer-Copies of the contract and modifications PWS government property
inventory security clearances overtime if the authorization granted by the COR

What is the contracting officer representative ✔Correct Answer-A technical representative that is
appointed by the contacting officer through a designated/appointment letter

What guidelines should contracting officers representatives follow to ensure they are following
ethical standards ✔Correct Answer-All of these answers are correct

See or documentation for all types of contracts should be retained by whom ✔Correct Answer-
Three years at the end of the contract to see your file should be turned over to the contracting
officer

The main purpose for the COR to understand the contract and how it is organized... Insured
contractor compliance with the contract was written ✔Correct Answer-True

When writing a SOW use the smart principle which stands for ✔Correct Answer-Specific
measurable accountable reasonable time based

Using in formal source selection the contracting officer acts as though ✔Correct Answer-True

What is a key role of the COR in the acquisition planning ✔Correct Answer-Contact market
research and develop requirements

The three types of restrictions on funds are purpose (Misappropriation act) time ✔Correct
Answer-True

An on authorized commitment is caused by government personnel obligating ✔Correct Answer-
True

The contracting officer's representative must read and understand the ✔Correct Answer-True

After an issue has been identified and there is a correct of plan in place for COR should ✔Correct
Answer-Continue to monitor the contract and ensure that the contractors complying with fulfilling
the contract

, In accounting classification requirements number is ✔Correct Answer-All of these responses are
correct

One of the main responsibilities of the COR is modifying the contract is to provide the contracting
✔Correct Answer-True

What is in independent government estimate ✔Correct Answer-An independent detail assignment
developed by the government team member

The purpose of evaluation factor is to represent the key areas of ✔Correct Answer-The offeror can
be evaluated against a valuation factors and

The contractor paid $85 for a federal employees dinner was an ethical law or ✔Correct Answer-Yes
18 US code section 201 prohibits unlawful gratitudes

Cost reimbursement contracts are used when there is uncertain ✔Correct Answer-Under a cost
reimbursement contract the contractor is reimbursed for all allowable

A purchase request is an official request for action that authorize the contracting ✔Correct
Answer-True

What areas of the contract under the uniform contract format specify Schedule/ ✔Correct Answer-
All the answers are correct

A separate contract line item number should be used for each item on the contract ✔Correct
Answer-True

Common cause of a constructive change include ✔Correct Answer-All these answers are correct

During negotiations for a proposal change to the contract to COR ✔Correct Answer-All these
responses are correct

The sea or should work with the contracting officer is to see you are identifies and need to change a
current ✔Correct Answer-True

See or has identified a change the contract that will Increase cost what steps ✔Correct Answer-
Identify the change the contract completed time to go evaluation of the contractors

During negotiations for a proposal to change the contract the contracting officer ✔Correct Answer-
True

See a R should be familiar with all the following areas of a contract ✔Correct Answer-All these
statements are correct

When changes are made to a contract to government must determine if the change is within scope
in plain English ✔Correct Answer-True

During contingency operations in an immature economic. There are limits to the use of the world
area workflow ✔Correct Answer-True

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Stuvia2026 Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
12
Member since
7 months
Number of followers
0
Documents
3782
Last sold
1 week ago
"Your trusted Hub for Academic Excellence"

Stuvia 2024 is your trusted destination for top-tier study materials, including high-quality exams, assignments, and verified answer keys. Our content is crafted for excellence thorough, up-to-date, and tailored to help students succeed in their academic journey. Whether you're preparing for a final exam or need support with coursework, every document in our store is designed to provide clarity, accuracy, and confidence. At Stuvia 2024, academic success starts with the right resources.

Read more Read less
3.0

1 reviews

5
0
4
0
3
1
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions