Practice questions for this set
Learn 1 /7 Study using Learn
The contractor's inspector
Give this one a go later!
Who is responsible to ensure that welding
Given, a column is 29 feet long. What is
1 equipment conforms to the requirements
the maximum variation in straightness?
of AWS D1.1?
, On structural steel, which of the following
Submerged arc welding flux received
conditions
in damaged packaging must be
3 4 is acceptable for a 5/16 inch (8 mm) fillet
discarded
weld that is 20
or dried under what conditions?
inches (500 mm) long?
Press any key to continue Don't know? Continue
Terms in this set (183)
A 5/16 inch fillet weld is used to 1-7/8 sq.in; D1.4 2.3
connect two 1/2 inch steel plates
in a "T"
configuration. The fillet weld is 6
inches
in length. What is the effective
area of this
fillet weld?
The acceptance criteria used Visual; D1.1 6.10
when magnetic particle testing is
performed is the same as that
used for
According to AWS D1.1, when The contractor; D1.1 6.6.4
nondestructive examination other
than visual inspection is required,
who is responsible to ensure that
all specified welds meet the
project quality requirements?
,According to AWS D1.4 2005, fillet welds; D1.4 6.1.2.1
Welding Procedure
Specification qualification testing
is required for all joints except?
According to AWS D1.4 2005, The contractor; D1.4 6.1.1.2
who is responsible for
conducting tests required to
qualify Welding Procedure
Specifications?
All electrodes having low Hermetically sealed containers; D1.1 5.3.2.1
hydrogen coverings shall be
purchased in?
The allowable atmospheric 1/2 hour; D1.1 T5.1 or D1.4 5.8.2 & T5.1
exposure time for E100XX
low hydrogen electrodes
meeting the requirements of
AWS A5.5 shall not exceed?
Arc strikes are acceptable if there Blemishes caused by the arc strike are ground to a
are smooth contour, and the area is crack-free; D1.1 5.29
Base metal surfaces of existing 2" from the root of the weld
base metal in contact with new
base metal which will be welded
shall be thoroughly cleaned of all
foreign matter including paint for
at least:
, The bearing ends of bearing 75%; 5.23.10
stiffener
shall be square with the web and
have at
least ____________ of the stiffener
bearing cross sectional area in
contact
with the inner surface of the
flanges.
Calibration of meters and gauges Not required on any specific schedule
for welding equipment is
required to be performed
A CJP groove weld qualification 1/8" to 1"
on 1/2" thick plate qualifies a
procedure for what range of
thickness?
Complete information regarding Contract plans and specifications; D1.1 2.2.1
base metal specification
designation shall be clearly
shown on the
A complete penetration groove 8" (2" beyond each end); D1.1 5.26.4
weld is
found to have a crack that is 4
inches in
length. How much of the weld
metal must
be removed?
The drawings indicate the welded Submerged Arc Welding (SAW); D1.1 Farhan's Table
joint to be a B-U2-S. What
welding process is to be used?
The effective throat of a skewed The distance from the root to the face less the Z loss dimension
T-joint with an acute angle of 45
deg is determined by: